Power assets and projects · USA · eia860m

Faraday Energy Storage / FBS1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)150 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a2b1ab2d3416aa49afe61784
Net Summer Capacity (MW)150 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a2b1ab2d3416aa49afe61784
Net Winter Capacity (MW)150 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a2b1ab2d3416aa49afe61784
Detailed source fields
Original source fieldPublished value or condition
Entity ID66950
Entity NameLydian Energy
Plant ID69424
Plant NameFaraday Energy Storage
Google MapMap
Bing MapMap
Plant StateUT
CountyUtah
Balancing Authority CodePACE
SectorIPP Non-CHP
Generator IDFBS1
Nameplate Capacity (MW)150
Net Summer Capacity (MW)150
Net Winter Capacity (MW)150
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2026
Status(U) Under construction, less than or equal to 50 percent complete
Latitude40.082
Longitude-112.069
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:122

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1849

Sources EV-43486233b40e45d04c0cb7b9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3aa84a5a6d39c48bdc016ccd41f12db516f4d3baf24dd08311403b2a3cc79d35

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:122

Sources EV-a2b1ab2d3416aa49afe61784
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4c64c56dc996f2eb00a658ad450a9784341df3906c841c23f3ab2909f8b54dab

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Faraday Energy Storage / FBS1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID66950
Entity NameLydian Energy
Plant ID69424
Plant NameFaraday Energy Storage
Google MapMap
Bing MapMap
Plant StateUT
CountyUtah
Balancing Authority CodePACE
SectorIPP Non-CHP
Generator IDFBS1
Nameplate Capacity (MW)150
Net Summer Capacity (MW)150
Net Winter Capacity (MW)150
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2026
Status(U) Under construction, less than or equal to 50 percent complete
Latitude40.082
Longitude-112.069
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:122

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:122

Sources EV-a2b1ab2d3416aa49afe61784
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4c64c56dc996f2eb00a658ad450a9784341df3906c841c23f3ab2909f8b54dab

Usage terms US government public domain

Source snapshots by date · USA · eia860

Faraday Energy Storage / FBS1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID66950
Utility NameLydian Energy
Plant Code69424
Plant NameFaraday Energy Storage
StateUT
CountyUtah
Generator IDFBS1
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)150
Summer Capacity (MW)150
Winter Capacity (MW)150
StatusU
Effective Month9
Effective Year2026
Current Month9
Current Year2026
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1849

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1849

Sources EV-43486233b40e45d04c0cb7b9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3aa84a5a6d39c48bdc016ccd41f12db516f4d3baf24dd08311403b2a3cc79d35

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel