POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Bison Generation Station / CT2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)496 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-e4a193b22b338e8db14d46d2
Net Summer Capacity (MW)409 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-e4a193b22b338e8db14d46d2
Net Winter Capacity (MW)409 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-e4a193b22b338e8db14d46d2
Detailed source fields
Original source fieldPublished value or condition
Entity ID1307
Entity NameBasin Electric Power Coop
Plant ID69071
Plant NameBison Generation Station
Google MapMap
Bing MapMap
Plant StateND
CountyWilliams
Balancing Authority CodeSWPP
SectorElectric Utility
Generator IDCT2
Unit CodeCC2
Nameplate Capacity (MW)496
Net Summer Capacity (MW)409
Net Winter Capacity (MW)409
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Planned Operation Month3
Planned Operation Year2030
Status(L) Regulatory approvals pending. Not under construction
Latitude48.327932
Longitude-103.3127
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:2053

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1645

Sources EV-429c36fab296dbcbfa5d2387
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 af8776f29f57bb01e18aa9027a2fa907f40451090e424737c11e193e5047d158

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2053

Sources EV-e4a193b22b338e8db14d46d2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9e881021deefdcd2bfbff5f71a8892c059bf6211ca774f3329f47cbf618b2cbd

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Bison Generation Station / CT2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID1307
Entity NameBasin Electric Power Coop
Plant ID69071
Plant NameBison Generation Station
Google MapMap
Bing MapMap
Plant StateND
CountyWilliams
Balancing Authority CodeSWPP
SectorElectric Utility
Generator IDCT2
Unit CodeCC2
Nameplate Capacity (MW)496
Net Summer Capacity (MW)409
Net Winter Capacity (MW)409
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Planned Operation Month3
Planned Operation Year2030
Status(L) Regulatory approvals pending. Not under construction
Latitude48.327932
Longitude-103.3127
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:2053

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2053

Sources EV-e4a193b22b338e8db14d46d2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9e881021deefdcd2bfbff5f71a8892c059bf6211ca774f3329f47cbf618b2cbd

Usage terms US government public domain

Source snapshots by date · USA · eia860

Bison Generation Station / CT2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID1307
Utility NameBasin Electric Power Coop
Plant Code69071
Plant NameBison Generation Station
StateND
CountyWilliams
Generator IDCT2
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCT
Unit CodeCC2
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?N
Nameplate Capacity (MW)496
Nameplate Power Factor0.85
Summer Capacity (MW)409
Winter Capacity (MW)409
StatusL
Effective Month3
Effective Year2030
Current Month3
Current Year2030
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Multiple Fuels?N
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1645

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1645

Sources EV-429c36fab296dbcbfa5d2387
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 af8776f29f57bb01e18aa9027a2fa907f40451090e424737c11e193e5047d158

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel