Power assets and projects · USA · eia860m
MDD109-NCBP BLDG 11-Manekin / MD11
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
2.4 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-110d7b63cbb07ab8b9fdd939
Net Summer Capacity (MW)
2.4 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-110d7b63cbb07ab8b9fdd939
Net Winter Capacity (MW)
2.4 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-110d7b63cbb07ab8b9fdd939
Detailed source fields
Original source field
Published value or condition
Entity ID
65539
Entity Name
Pivot Energy
Plant ID
69052
Plant Name
MDD109-NCBP BLDG 11-Manekin
Google Map
Map
Bing Map
Map
Plant State
MD
County
Prince Georges
Balancing Authority Code
PJM
Sector
IPP Non-CHP
Generator ID
MD11
Nameplate Capacity (MW)
2.4
Net Summer Capacity (MW)
2.4
Net Winter Capacity (MW)
2.4
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
9
Planned Operation Year
2026
Status
(V) Under construction, more than 50 percent complete
Latitude
38.8739
Longitude
-76.7342
Original text
(V) Under construction, more than 50 percent complete