Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Sawtooth Solar / STPV
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
250 MW
Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-edc6d43c6a7b974791bedf79
Net Summer Capacity (MW)
250 MW
Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-edc6d43c6a7b974791bedf79
Net Winter Capacity (MW)
250 MW
Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-edc6d43c6a7b974791bedf79
Detailed source fields
Original source field
Published value or condition
Entity ID
64452
Entity Name
EDF Renewables Development, Inc.
Plant ID
68883
Plant Name
Sawtooth Solar
Google Map
Map
Bing Map
Map
Plant State
AZ
County
Pinal
Balancing Authority Code
AZPS
Sector
IPP Non-CHP
Generator ID
STPV
Nameplate Capacity (MW)
250
Net Summer Capacity (MW)
250
Net Winter Capacity (MW)
250
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
6
Planned Operation Year
2028
Status
(L) Regulatory approvals pending. Not under construction
Latitude
32.728
Longitude
-111.629
Original text
(L) Regulatory approvals pending. Not under construction