POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Tri County - TenK / TRICO Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 1 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1d9743d283b6aaeb6ab30061 Net Summer Capacity (MW) 1 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1d9743d283b6aaeb6ab30061 Net Winter Capacity (MW) 1 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1d9743d283b6aaeb6ab30061 DC Net Capacity (MW) 1.6 MWdc Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1d9743d283b6aaeb6ab30061
Detailed source fields Original source field Published value or condition Entity ID 61204 Entity Name Today's Power, Inc. Plant ID 68725 Plant Name Tri County - TenK Google Map Map Bing Map Map Plant State OK County Texas Balancing Authority Code SWPP Sector Electric Utility Generator ID TRICO Nameplate Capacity (MW) 1 Net Summer Capacity (MW) 1 Net Winter Capacity (MW) 1 Technology Solar Photovoltaic Energy Source Code SUN Prime Mover Code PV Operating Month 4 Operating Year 2016 Status (OP) Operating DC Net Capacity (MW) 1.6 Latitude 36.863541 Longitude -101.194 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:27260
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:27071
Sources EV-0a2c181ae9f499cfef825f31 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 f71a9082d961b8f17cfdce508d766d51415dbb25feadafafc4fc5fee0c1520b9 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:27260
Sources EV-1d9743d283b6aaeb6ab30061 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 9de18adbc5e03d30f3bcb7a21929eeb3a21859a95ca04af0161d92d19bf416cf Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Tri County - TenK / TRICO Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 61204 Entity Name Today's Power, Inc. Plant ID 68725 Plant Name Tri County - TenK Google Map Map Bing Map Map Plant State OK County Texas Balancing Authority Code SWPP Sector Electric Utility Generator ID TRICO Nameplate Capacity (MW) 1 Net Summer Capacity (MW) 1 Net Winter Capacity (MW) 1 Technology Solar Photovoltaic Energy Source Code SUN Prime Mover Code PV Operating Month 4 Operating Year 2016 Status (OP) Operating DC Net Capacity (MW) 1.6 Latitude 36.863541 Longitude -101.194 Original text (OP) Operating source_record_id Operating:27260
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:27260
Sources EV-1d9743d283b6aaeb6ab30061 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 9de18adbc5e03d30f3bcb7a21929eeb3a21859a95ca04af0161d92d19bf416cf Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Tri County - TenK / TRICO Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 61204 Utility Name Today's Power, Inc. Plant Code 68725 Plant Name Tri County - TenK State OK County Texas Generator ID TRICO Technology Solar Photovoltaic Prime Mover PV Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 1 Summer Capacity (MW) 1 Winter Capacity (MW) 1 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 4 Operating Year 2016 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 SUN Solid Fuel Gasification System? N Carbon Capture Technology? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:27071
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:27071
Sources EV-0a2c181ae9f499cfef825f31 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 f71a9082d961b8f17cfdce508d766d51415dbb25feadafafc4fc5fee0c1520b9 Usage terms US government public domain
Observations for this power asset