Power assets and projects · USA · eia860m

Smarr Combined Cycle Energy Facility / 1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)459 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-fc166606be9074977af1d9ba
Net Summer Capacity (MW)407 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-fc166606be9074977af1d9ba
Net Winter Capacity (MW)432 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-fc166606be9074977af1d9ba
Detailed source fields
Original source fieldPublished value or condition
Entity ID13994
Entity NameOglethorpe Power Corporation
Plant ID68546
Plant NameSmarr Combined Cycle Energy Facility
Google MapMap
Bing MapMap
Plant StateGA
CountyMonroe
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID1
Unit Code1
Nameplate Capacity (MW)459
Net Summer Capacity (MW)407
Net Winter Capacity (MW)432
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCC
Planned Operation Month6
Planned Operation Year2029
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude32.975936
Longitude-83.84369
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1916

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1391

Sources EV-6fe82e5458c55acd70b66b07
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 caac5a5dcd4f979e887187d184c756f73edac210e2fae77e5926d8f13f643a43

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1916

Sources EV-fc166606be9074977af1d9ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cad499287d6effd5a5ac3e2b99337605b4ed3a5804243a6d93dfc6a196ba81ab

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Smarr Combined Cycle Energy Facility / 1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13994
Entity NameOglethorpe Power Corporation
Plant ID68546
Plant NameSmarr Combined Cycle Energy Facility
Google MapMap
Bing MapMap
Plant StateGA
CountyMonroe
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID1
Unit Code1
Nameplate Capacity (MW)459
Net Summer Capacity (MW)407
Net Winter Capacity (MW)432
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCC
Planned Operation Month6
Planned Operation Year2029
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude32.975936
Longitude-83.84369
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1916

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1916

Sources EV-fc166606be9074977af1d9ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cad499287d6effd5a5ac3e2b99337605b4ed3a5804243a6d93dfc6a196ba81ab

Usage terms US government public domain

Source snapshots by date · USA · eia860

Smarr Combined Cycle Energy Facility / 1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13994
Utility NameOglethorpe Power Corporation
Plant Code68546
Plant NameSmarr Combined Cycle Energy Facility
StateGA
CountyMonroe
Generator ID1
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCC
Unit Code1
OwnershipS
Duct BurnersY
Can Bypass Heat Recovery Steam Generator?N
Nameplate Capacity (MW)459
Nameplate Power Factor0.85
Summer Capacity (MW)407
Winter Capacity (MW)432
StatusP
Effective Month6
Effective Year2029
Current Month6
Current Year2029
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Multiple Fuels?N
Switch Between Oil and Natural Gas?N
Cofire Fuels?N
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1391

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1391

Sources EV-6fe82e5458c55acd70b66b07
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 caac5a5dcd4f979e887187d184c756f73edac210e2fae77e5926d8f13f643a43

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel