POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Merced 2 BESS / MRC2B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-c8bfbd2db3018a0df9276591
Net Summer Capacity (MW)2 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-c8bfbd2db3018a0df9276591
Net Winter Capacity (MW)2 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-c8bfbd2db3018a0df9276591
Detailed source fields
Original source fieldPublished value or condition
Entity ID60059
Entity NameZGlobal Inc
Plant ID68518
Plant NameMerced 2 BESS
Google MapMap
Bing MapMap
Plant StateCA
CountyMerced
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDMRC2B
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude37.000929
Longitude-120.6648
Original text(TS) Construction complete, but not yet in commercial operation
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:82

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1376

Sources EV-3b6f6c16fbe4a062d204328b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6d49e205a4f4ac35cdc7f49c2754a95d202579bd633ce4184312d1f83e91846c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:82

Sources EV-c8bfbd2db3018a0df9276591
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 70fb7303204337669da1bf5adc86e17b627bd6a9f1b3b0f6bd7a1c781dd6a3a0

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Merced 2 BESS / MRC2B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID60059
Entity NameZGlobal Inc
Plant ID68518
Plant NameMerced 2 BESS
Google MapMap
Bing MapMap
Plant StateCA
CountyMerced
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDMRC2B
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude37.000929
Longitude-120.6648
Original text(TS) Construction complete, but not yet in commercial operation
source_record_idPlanned:82

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:82

Sources EV-c8bfbd2db3018a0df9276591
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 70fb7303204337669da1bf5adc86e17b627bd6a9f1b3b0f6bd7a1c781dd6a3a0

Usage terms US government public domain

Source snapshots by date · USA · eia860

Merced 2 BESS / MRC2B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID60059
Utility NameZGlobal Inc
Plant Code68518
Plant NameMerced 2 BESS
StateCA
CountyMerced
Generator IDMRC2B
TechnologyBatteries
Prime MoverBA
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2
Nameplate Power Factor0.89
Summer Capacity (MW)2
Winter Capacity (MW)2
StatusTS
Effective Month1
Effective Year2026
Current Month9
Current Year2026
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textTS
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1376

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1376

Sources EV-3b6f6c16fbe4a062d204328b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6d49e205a4f4ac35cdc7f49c2754a95d202579bd633ce4184312d1f83e91846c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel