Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Sunrose Renewable Energy / SRSEB
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
300 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-6bc7ef5674a4ed35cec1282f
Net Summer Capacity (MW)
300 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-6bc7ef5674a4ed35cec1282f
Net Winter Capacity (MW)
300 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-6bc7ef5674a4ed35cec1282f
Detailed source fields
Original source field
Published value or condition
Entity ID
64545
Entity Name
Vesper Energy Development LLC
Plant ID
68033
Plant Name
Sunrose Renewable Energy
Google Map
Map
Bing Map
Map
Plant State
TX
County
Austin
Balancing Authority Code
ERCO
Sector
IPP Non-CHP
Generator ID
SRSEB
Nameplate Capacity (MW)
300
Net Summer Capacity (MW)
300
Net Winter Capacity (MW)
300
Technology
Batteries
Energy Source Code
MWH
Prime Mover Code
BA
Planned Operation Month
12
Planned Operation Year
2027
Status
(P) Planned for installation, but regulatory approvals not initiated
Latitude
29.674226
Longitude
-96.12137
Original text
(P) Planned for installation, but regulatory approvals not initiated