POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Red Hollow Renewable Energy / RHLWB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)300 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-228b2bbf4c937770f42ee92e
Net Summer Capacity (MW)300 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-228b2bbf4c937770f42ee92e
Net Winter Capacity (MW)300 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-228b2bbf4c937770f42ee92e
Detailed source fields
Original source fieldPublished value or condition
Entity ID64545
Entity NameVesper Energy Development LLC
Plant ID68030
Plant NameRed Hollow Renewable Energy
Google MapMap
Bing MapMap
Plant StateTX
CountyArcher
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDRHLWB
Nameplate Capacity (MW)300
Net Summer Capacity (MW)300
Net Winter Capacity (MW)300
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month10
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude33.564936
Longitude-98.612
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1090

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1028

Sources EV-8216ca068cd241b1c31966f5
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2afa20c71bb90b017d49fadf8aa6b7fb7b27f8754c5efd34aaf9d5633ed650b1

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1090

Sources EV-228b2bbf4c937770f42ee92e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e6fd5b465df7b39aaaac70b3d364c07e53c9a3f120330a8e719a34be24684500

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Red Hollow Renewable Energy / RHLWB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID64545
Entity NameVesper Energy Development LLC
Plant ID68030
Plant NameRed Hollow Renewable Energy
Google MapMap
Bing MapMap
Plant StateTX
CountyArcher
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDRHLWB
Nameplate Capacity (MW)300
Net Summer Capacity (MW)300
Net Winter Capacity (MW)300
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month10
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude33.564936
Longitude-98.612
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1090

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1090

Sources EV-228b2bbf4c937770f42ee92e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e6fd5b465df7b39aaaac70b3d364c07e53c9a3f120330a8e719a34be24684500

Usage terms US government public domain

Source snapshots by date · USA · eia860

Red Hollow Renewable Energy / RHLWB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID64545
Utility NameVesper Energy Development LLC
Plant Code68030
Plant NameRed Hollow Renewable Energy
StateTX
CountyArcher
Generator IDRHLWB
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)300
Summer Capacity (MW)300
Winter Capacity (MW)300
StatusP
Effective Month10
Effective Year2027
Current Month10
Current Year2027
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Multiple Fuels?N
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1028

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1028

Sources EV-8216ca068cd241b1c31966f5
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2afa20c71bb90b017d49fadf8aa6b7fb7b27f8754c5efd34aaf9d5633ed650b1

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel