POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Hornet Solar II (TX) (Hybrid) / HRT2B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)200 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b66933a2cf521e75b5d6a7cc
Net Summer Capacity (MW)200 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b66933a2cf521e75b5d6a7cc
Net Winter Capacity (MW)200 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b66933a2cf521e75b5d6a7cc
Detailed source fields
Original source fieldPublished value or condition
Entity ID64545
Entity NameVesper Energy Development LLC
Plant ID67985
Plant NameHornet Solar II (TX) (Hybrid)
Google MapMap
Bing MapMap
Plant StateTX
CountySwisher
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDHRT2B
Nameplate Capacity (MW)200
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month3
Planned Operation Year2028
Status(L) Regulatory approvals pending. Not under construction
Latitude34.483406
Longitude-101.9699
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1465

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:990

Sources EV-50fe7b72e80d963a82344940
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3ae122b88b1acf2ee792b43b3a216284c193016a3f8af9e994842afd1834db78

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1465

Sources EV-b66933a2cf521e75b5d6a7cc
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6942432163af6f0435f48ef1b52ef47543d84ae7de485411439c9f42027fd024

Usage terms US government public domain

Source snapshots by date · USA · eia860

Hornet Solar II (TX) (Hybrid) / HRT2B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID64545
Utility NameVesper Energy Development LLC
Plant Code67985
Plant NameHornet Solar II (TX) (Hybrid)
StateTX
CountySwisher
Generator IDHRT2B
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)200
Summer Capacity (MW)200
Winter Capacity (MW)200
StatusL
Effective Month6
Effective Year2026
Current Month3
Current Year2028
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Multiple Fuels?N
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:990

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:990

Sources EV-50fe7b72e80d963a82344940
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3ae122b88b1acf2ee792b43b3a216284c193016a3f8af9e994842afd1834db78

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Hornet Solar II (TX) (Hybrid) / HRT2B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID64545
Entity NameVesper Energy Development LLC
Plant ID67985
Plant NameHornet Solar II (TX) (Hybrid)
Google MapMap
Bing MapMap
Plant StateTX
CountySwisher
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDHRT2B
Nameplate Capacity (MW)200
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month3
Planned Operation Year2028
Status(L) Regulatory approvals pending. Not under construction
Latitude34.483406
Longitude-101.9699
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:1465

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1465

Sources EV-b66933a2cf521e75b5d6a7cc
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6942432163af6f0435f48ef1b52ef47543d84ae7de485411439c9f42027fd024

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel