Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Lupinus Storage 3 / LUPE3
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
50.9 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f2096ae3fe532f409b265814
Net Summer Capacity (MW)
50.9 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f2096ae3fe532f409b265814
Net Winter Capacity (MW)
50.9 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f2096ae3fe532f409b265814
Detailed source fields
Original source field
Published value or condition
Entity ID
65815
Entity Name
Sunraycer Assets I LLC
Plant ID
67674
Plant Name
Lupinus Storage 3
Google Map
Map
Bing Map
Map
Plant State
TX
County
Franklin
Balancing Authority Code
ERCO
Sector
IPP Non-CHP
Generator ID
LUPE3
Nameplate Capacity (MW)
50.9
Net Summer Capacity (MW)
50.9
Net Winter Capacity (MW)
50.9
Technology
Batteries
Energy Source Code
MWH
Prime Mover Code
BA
Planned Operation Month
6
Planned Operation Year
2027
Status
(U) Under construction, less than or equal to 50 percent complete
Latitude
33.3015
Longitude
-95.2548
Original text
(U) Under construction, less than or equal to 50 percent complete