Power assets and projects · USA · eia860m

Cairos Solar and Storage / CIRSB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)77.3 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-98b86f30d070ff31befd154b
Net Summer Capacity (MW)77.3 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-98b86f30d070ff31befd154b
Net Winter Capacity (MW)77.3 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-98b86f30d070ff31befd154b
Detailed source fields
Original source fieldPublished value or condition
Entity ID65144
Entity NameSamsung C&T Renewables, LLC
Plant ID67581
Plant NameCairos Solar and Storage
Google MapMap
Bing MapMap
Plant StateTX
CountyKinney
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCIRSB
Nameplate Capacity (MW)77.3
Net Summer Capacity (MW)77.3
Net Winter Capacity (MW)77.3
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month6
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude29.269974
Longitude-100.1975
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:862

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:879

Sources EV-e809ebab55d102cdac7d9132
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 84d50cd511c8b722d0535c8a39db5188c323209378fd3faf85e7b34f1b202ad3

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:862

Sources EV-98b86f30d070ff31befd154b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f024ec1de437c8ba3f2eb43610279e390ccd7daf0eddf5f80a05a619ec6c561b

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Cairos Solar and Storage / CIRSB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID65144
Entity NameSamsung C&T Renewables, LLC
Plant ID67581
Plant NameCairos Solar and Storage
Google MapMap
Bing MapMap
Plant StateTX
CountyKinney
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCIRSB
Nameplate Capacity (MW)77.3
Net Summer Capacity (MW)77.3
Net Winter Capacity (MW)77.3
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month6
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude29.269974
Longitude-100.1975
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:862

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:862

Sources EV-98b86f30d070ff31befd154b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f024ec1de437c8ba3f2eb43610279e390ccd7daf0eddf5f80a05a619ec6c561b

Usage terms US government public domain

Source snapshots by date · USA · eia860

Cairos Solar and Storage / CIRSB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID65144
Utility NameSamsung C&T Renewables, LLC
Plant Code67581
Plant NameCairos Solar and Storage
StateTX
CountyKinney
Generator IDCIRSB
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)77.3
Summer Capacity (MW)77.3
Winter Capacity (MW)77.3
StatusP
Effective Month3
Effective Year2026
Current Month6
Current Year2027
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:879

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:879

Sources EV-e809ebab55d102cdac7d9132
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 84d50cd511c8b722d0535c8a39db5188c323209378fd3faf85e7b34f1b202ad3

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel