Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Park Solar / PARK Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 1 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-508154f4e67d692c5a8f74f1 Net Summer Capacity (MW) 1 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-508154f4e67d692c5a8f74f1 Net Winter Capacity (MW) 1 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-508154f4e67d692c5a8f74f1 DC Net Capacity (MW) 1.2 MWdc Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-508154f4e67d692c5a8f74f1
Detailed source fields Original source field Published value or condition Entity ID 58135 Entity Name Ecos Energy LLC Plant ID 67351 Plant Name Park Solar Google Map Map Bing Map Map Plant State CT County New Haven Balancing Authority Code ISNE Sector IPP Non-CHP Generator ID PARK Nameplate Capacity (MW) 1 Net Summer Capacity (MW) 1 Net Winter Capacity (MW) 1 Technology Solar Photovoltaic Energy Source Code SUN Prime Mover Code PV Operating Month 12 Operating Year 2023 Status (OP) Operating DC Net Capacity (MW) 1.2 Latitude 41.3367 Longitude -72.9868 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:26245
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:26161
Sources EV-ab8bc9ba67dafdd983dd8acb Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 b1f166b44fea846918567a04d1d0ba051fc609e613a794148796f9aaee3dc774 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:26245
Sources EV-508154f4e67d692c5a8f74f1 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 f389e4aea49974a4b1edb97f4a01ff187a0c320c29adb44f0820c4d947f11b46 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Park Solar / PARK Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 58135 Entity Name Ecos Energy LLC Plant ID 67351 Plant Name Park Solar Google Map Map Bing Map Map Plant State CT County New Haven Balancing Authority Code ISNE Sector IPP Non-CHP Generator ID PARK Nameplate Capacity (MW) 1 Net Summer Capacity (MW) 1 Net Winter Capacity (MW) 1 Technology Solar Photovoltaic Energy Source Code SUN Prime Mover Code PV Operating Month 12 Operating Year 2023 Status (OP) Operating DC Net Capacity (MW) 1.2 Latitude 41.3367 Longitude -72.9868 Original text (OP) Operating source_record_id Operating:26245
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:26245
Sources EV-508154f4e67d692c5a8f74f1 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 f389e4aea49974a4b1edb97f4a01ff187a0c320c29adb44f0820c4d947f11b46 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Park Solar / PARK Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 58135 Utility Name Ecos Energy LLC Plant Code 67351 Plant Name Park Solar State CT County New Haven Generator ID PARK Technology Solar Photovoltaic Prime Mover PV Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 1 Nameplate Power Factor 0.99 Summer Capacity (MW) 1 Winter Capacity (MW) 1 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 12 Operating Year 2023 Associated with Combined Heat and Power System N Sector Name IPP Non-CHP Sector 2 Topping or Bottoming X Energy Source 1 SUN Solid Fuel Gasification System? N Carbon Capture Technology? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:26161
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:26161
Sources EV-ab8bc9ba67dafdd983dd8acb Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 b1f166b44fea846918567a04d1d0ba051fc609e613a794148796f9aaee3dc774 Usage terms US government public domain
Observations for this power asset