Power assets and projects · USA · eia860m

Cherry Valley / 761

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)12.5 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-1cbcb2eab8cb99910d3c1840
Net Summer Capacity (MW)12.5 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-1cbcb2eab8cb99910d3c1840
Net Winter Capacity (MW)12.5 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-1cbcb2eab8cb99910d3c1840
Detailed source fields
Original source fieldPublished value or condition
Entity ID60025
Entity NameGreenbacker Renewable Energy Corporation
Plant ID67253
Plant NameCherry Valley
Google MapMap
Bing MapMap
Plant StateIL
CountyBoone
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator ID761
Nameplate Capacity (MW)12.5
Net Summer Capacity (MW)12.5
Net Winter Capacity (MW)12.5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude42.240017
Longitude-88.93076
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1274

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:811

Sources EV-946be13100e311dbd8bb855c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7d5c7ed06441c32cffc7368c14823422c72f5e141a41ba49347e357e0ac50a63

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1274

Sources EV-1cbcb2eab8cb99910d3c1840
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c7440deabf6c9e335a36fab541764e19038b7622445c21af9a46d9665e83f6f9

Usage terms US government public domain

Source snapshots by date · USA · eia860

Cherry Valley / 761

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID60025
Utility NameGreenbacker Renewable Energy Corporation
Plant Code67253
Plant NameCherry Valley
StateIL
CountyBoone
Generator ID761
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)12.5
Summer Capacity (MW)12.5
Winter Capacity (MW)12.5
StatusU
Effective Month8
Effective Year2025
Current Month12
Current Year2027
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:811

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:811

Sources EV-946be13100e311dbd8bb855c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7d5c7ed06441c32cffc7368c14823422c72f5e141a41ba49347e357e0ac50a63

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Cherry Valley / 761

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID60025
Entity NameGreenbacker Renewable Energy Corporation
Plant ID67253
Plant NameCherry Valley
Google MapMap
Bing MapMap
Plant StateIL
CountyBoone
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator ID761
Nameplate Capacity (MW)12.5
Net Summer Capacity (MW)12.5
Net Winter Capacity (MW)12.5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude42.240017
Longitude-88.93076
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:1274

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1274

Sources EV-1cbcb2eab8cb99910d3c1840
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c7440deabf6c9e335a36fab541764e19038b7622445c21af9a46d9665e83f6f9

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel