POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Unbridled Solar / UBSLR

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)160 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e0ecaf63d9dd82084ebf15d9
Net Summer Capacity (MW)160 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e0ecaf63d9dd82084ebf15d9
Net Winter Capacity (MW)160 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e0ecaf63d9dd82084ebf15d9
DC Net Capacity (MW)208.4 MWdcOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e0ecaf63d9dd82084ebf15d9
Detailed source fields
Original source fieldPublished value or condition
Entity ID62759
Entity NameGeronimo Power
Plant ID67165
Plant NameUnbridled Solar
Google MapMap
Bing MapMap
Plant StateKY
CountyHenderson
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDUBSLR
Nameplate Capacity (MW)160
Net Summer Capacity (MW)160
Net Winter Capacity (MW)160
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month3
Operating Year2025
Status(OP) Operating
DC Net Capacity (MW)208.4
Latitude37.652
Longitude-87.552
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:25991

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:25917

Sources EV-40c5c0e911d2696525017895
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 48f4c835b5dc3158513da3229310e8ab3c317de805c072a141fda2d591db07c4

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:25991

Sources EV-e0ecaf63d9dd82084ebf15d9
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 334eba541bfbe4a37b1e01d6ea0861ea2dab1c530e55612e44f0b0700ec14bbe

Usage terms US government public domain

Source snapshots by date · USA · eia860

Unbridled Solar / UBSLR

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID62759
Utility NameGeronimo Power
Plant Code67165
Plant NameUnbridled Solar
StateKY
CountyHenderson
Generator IDUBSLR
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)160
Summer Capacity (MW)160
Winter Capacity (MW)160
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month3
Operating Year2025
Sector NameIPP Non-CHP
Sector2
Energy Source 1SUN
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:25917

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:25917

Sources EV-40c5c0e911d2696525017895
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 48f4c835b5dc3158513da3229310e8ab3c317de805c072a141fda2d591db07c4

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Unbridled Solar / UBSLR

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID62759
Entity NameGeronimo Power
Plant ID67165
Plant NameUnbridled Solar
Google MapMap
Bing MapMap
Plant StateKY
CountyHenderson
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDUBSLR
Nameplate Capacity (MW)160
Net Summer Capacity (MW)160
Net Winter Capacity (MW)160
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month3
Operating Year2025
Status(OP) Operating
DC Net Capacity (MW)208.4
Latitude37.652
Longitude-87.552
Original text(OP) Operating
source_record_idOperating:25991

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:25991

Sources EV-e0ecaf63d9dd82084ebf15d9
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 334eba541bfbe4a37b1e01d6ea0861ea2dab1c530e55612e44f0b0700ec14bbe

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel