Archie Horne / BAT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)10 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1900aa9508a8d8ef5eb8090b
Net Summer Capacity (MW)10 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1900aa9508a8d8ef5eb8090b
Net Winter Capacity (MW)10 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1900aa9508a8d8ef5eb8090b
Nameplate Energy Capacity (MWh)20 MWhOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1900aa9508a8d8ef5eb8090b
Detailed source fields
Original source fieldPublished value or condition
Entity ID13683
Entity NameNorth Carolina El Member Corp
Plant ID67040
Plant NameArchie Horne
Google MapMap
Bing MapMap
Plant StateNC
CountyOnslow
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDBAT1
Nameplate Capacity (MW)10
Net Summer Capacity (MW)10
Net Winter Capacity (MW)10
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Operating Month12
Operating Year2024
Status(OP) Operating
Nameplate Energy Capacity (MWh)20
Latitude34.917699
Longitude-77.63126
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:25871

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:25800

Sources EV-f9542daa1552deb0f6a33e5f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c14d944b8e5aac4df7b10ebc3b5dbd63a7aa958288b9362b86f9f2434a417a1b

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:25871

Sources EV-1900aa9508a8d8ef5eb8090b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 53d1bb653ceb55b2c44f0417687349d532ecf49fdd9841a16093a973b7081f93

Usage terms US government public domain

Source snapshots by date · USA · eia860

Archie Horne / BAT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13683
Utility NameNorth Carolina El Member Corp
Plant Code67040
Plant NameArchie Horne
StateNC
CountyOnslow
Generator IDBAT1
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)10
Nameplate Power Factor1
Summer Capacity (MW)10
Winter Capacity (MW)10
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year2024
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1MWH
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:25800

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:25800

Sources EV-f9542daa1552deb0f6a33e5f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c14d944b8e5aac4df7b10ebc3b5dbd63a7aa958288b9362b86f9f2434a417a1b

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Archie Horne / BAT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13683
Entity NameNorth Carolina El Member Corp
Plant ID67040
Plant NameArchie Horne
Google MapMap
Bing MapMap
Plant StateNC
CountyOnslow
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDBAT1
Nameplate Capacity (MW)10
Net Summer Capacity (MW)10
Net Winter Capacity (MW)10
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Operating Month12
Operating Year2024
Status(OP) Operating
Nameplate Energy Capacity (MWh)20
Latitude34.917699
Longitude-77.63126
Original text(OP) Operating
source_record_idOperating:25871

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:25871

Sources EV-1900aa9508a8d8ef5eb8090b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 53d1bb653ceb55b2c44f0417687349d532ecf49fdd9841a16093a973b7081f93

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel