This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

CISCO BESS / CISCO

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)9.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a89c9aa0d84010be74b483ec
Net Summer Capacity (MW)9.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a89c9aa0d84010be74b483ec
Net Winter Capacity (MW)9.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a89c9aa0d84010be74b483ec
Nameplate Energy Capacity (MWh)9.9 MWhOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a89c9aa0d84010be74b483ec
Detailed source fields
Original source fieldPublished value or condition
Entity ID65076
Entity NameHEN Infrastructure, L.L.C.
Plant ID66795
Plant NameCISCO BESS
Google MapMap
Bing MapMap
Plant StateTX
CountyEastland
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCISCO
Nameplate Capacity (MW)9.9
Net Summer Capacity (MW)9.9
Net Winter Capacity (MW)9.9
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Operating Month10
Operating Year2024
Status(OP) Operating
Nameplate Energy Capacity (MWh)9.9
Latitude32.391533
Longitude-98.97816
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:25651

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:25592

Sources EV-647108860cd04ec0396244a7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a73580f514c0ad813b6a0b34a6896e3dd4d407ead333521d5023c005f5ef63d5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:25651

Sources EV-a89c9aa0d84010be74b483ec
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 88127c1f153244a295fa5909897942a1b0f492703a2a738569c2f6f725cbc1d3

Usage terms US government public domain

Source snapshots by date · USA · eia860m

CISCO BESS / CISCO

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID65076
Entity NameHEN Infrastructure, L.L.C.
Plant ID66795
Plant NameCISCO BESS
Google MapMap
Bing MapMap
Plant StateTX
CountyEastland
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCISCO
Nameplate Capacity (MW)9.9
Net Summer Capacity (MW)9.9
Net Winter Capacity (MW)9.9
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Operating Month10
Operating Year2024
Status(OP) Operating
Nameplate Energy Capacity (MWh)9.9
Latitude32.391533
Longitude-98.97816
Original text(OP) Operating
source_record_idOperating:25651

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:25651

Sources EV-a89c9aa0d84010be74b483ec
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 88127c1f153244a295fa5909897942a1b0f492703a2a738569c2f6f725cbc1d3

Usage terms US government public domain

Source snapshots by date · USA · eia860

CISCO BESS / CISCO

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID65076
Utility NameHEN Infrastructure, L.L.C.
Plant Code66795
Plant NameCISCO BESS
StateTX
CountyEastland
Generator IDCISCO
TechnologyBatteries
Prime MoverBA
OwnershipJ
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)9.9
Summer Capacity (MW)9.9
Winter Capacity (MW)9.9
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month10
Operating Year2024
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1MWH
Carbon Capture Technology?N
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:25592

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:25592

Sources EV-647108860cd04ec0396244a7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a73580f514c0ad813b6a0b34a6896e3dd4d407ead333521d5023c005f5ef63d5

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel