Power assets and projects · USA · eia860m

Black Walnut Solar, LLC / GEN1B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)32 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-36134927390afcb7308f58d2
Net Summer Capacity (MW)32 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-36134927390afcb7308f58d2
Net Winter Capacity (MW)32 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-36134927390afcb7308f58d2
Detailed source fields
Original source fieldPublished value or condition
Entity ID61060
Entity NameCypress Creek Renewables
Plant ID66363
Plant NameBlack Walnut Solar, LLC
Google MapMap
Bing MapMap
Plant StateNC
CountyJones
Balancing Authority CodeDUK
SectorIPP Non-CHP
Generator IDGEN1B
Nameplate Capacity (MW)32
Net Summer Capacity (MW)32
Net Winter Capacity (MW)32
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude35.050032
Longitude-77.15218
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1759

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:624

Sources EV-19e6d82540deaa90877648df
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b28a043ae7f0030ddd641de9628bb1162cf532ef3625995bcc3248180546379d

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1759

Sources EV-36134927390afcb7308f58d2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a4e272bb8b2473fb08edd18d8c7187b63f39b024cdd9f452db7597b2cb79bd2c

Usage terms US government public domain

Source snapshots by date · USA · eia860

Black Walnut Solar, LLC / GEN1B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61060
Utility NameCypress Creek Renewables
Plant Code66363
Plant NameBlack Walnut Solar, LLC
StateNC
CountyJones
Generator IDGEN1B
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)32
Summer Capacity (MW)32
Winter Capacity (MW)32
StatusP
Effective Month12
Effective Year2028
Current Month12
Current Year2028
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:624

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:624

Sources EV-19e6d82540deaa90877648df
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b28a043ae7f0030ddd641de9628bb1162cf532ef3625995bcc3248180546379d

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Black Walnut Solar, LLC / GEN1B

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61060
Entity NameCypress Creek Renewables
Plant ID66363
Plant NameBlack Walnut Solar, LLC
Google MapMap
Bing MapMap
Plant StateNC
CountyJones
Balancing Authority CodeDUK
SectorIPP Non-CHP
Generator IDGEN1B
Nameplate Capacity (MW)32
Net Summer Capacity (MW)32
Net Winter Capacity (MW)32
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude35.050032
Longitude-77.15218
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1759

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1759

Sources EV-36134927390afcb7308f58d2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a4e272bb8b2473fb08edd18d8c7187b63f39b024cdd9f452db7597b2cb79bd2c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel