POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Fort Peck / 5

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)40 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3efd8ab31d8a1bdb269f43a4
Net Summer Capacity (MW)49 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3efd8ab31d8a1bdb269f43a4
Net Winter Capacity (MW)49 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3efd8ab31d8a1bdb269f43a4
Detailed source fields
Original source fieldPublished value or condition
Entity ID19635
Entity NameUSACE-Omaha
Plant ID6623
Plant NameFort Peck
Google MapMap
Bing MapMap
Plant StateMT
CountyMcCone
Balancing Authority CodeWAUW
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)40
Net Summer Capacity (MW)49
Net Winter Capacity (MW)49
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1961
Status(OP) Operating
Latitude48.0122
Longitude-106.4123
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6779

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6784

Sources EV-0658ce93191073c7e3ae555a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f347b4f228617b78890d691210ccec783a430ab97b4856f5fdb7294bab15d827

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6779

Sources EV-3efd8ab31d8a1bdb269f43a4
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e6b3b52eb9ea127fc176bfdc95ada3f2e2195239de1d08bea0468ec219c4b061

Usage terms US government public domain

Source snapshots by date · USA · eia860

Fort Peck / 5

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID19635
Utility NameUSACE-Omaha
Plant Code6623
Plant NameFort Peck
StateMT
CountyMcCone
Generator ID5
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)40
Nameplate Power Factor0.95
Summer Capacity (MW)49
Winter Capacity (MW)49
Minimum Load (MW)1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1961
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6784

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6784

Sources EV-0658ce93191073c7e3ae555a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f347b4f228617b78890d691210ccec783a430ab97b4856f5fdb7294bab15d827

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Fort Peck / 5

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID19635
Entity NameUSACE-Omaha
Plant ID6623
Plant NameFort Peck
Google MapMap
Bing MapMap
Plant StateMT
CountyMcCone
Balancing Authority CodeWAUW
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)40
Net Summer Capacity (MW)49
Net Winter Capacity (MW)49
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1961
Status(OP) Operating
Latitude48.0122
Longitude-106.4123
Original text(OP) Operating
source_record_idOperating:6779

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6779

Sources EV-3efd8ab31d8a1bdb269f43a4
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e6b3b52eb9ea127fc176bfdc95ada3f2e2195239de1d08bea0468ec219c4b061

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel