Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Toledo Bend / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 40.5 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-bafe5a868cf60f628d254b2e Net Summer Capacity (MW) 40 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-bafe5a868cf60f628d254b2e Net Winter Capacity (MW) 40 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-bafe5a868cf60f628d254b2e
Detailed source fields Original source field Published value or condition Entity ID 55937 Entity Name Entergy Texas Inc. Plant ID 6595 Plant Name Toledo Bend Google Map Map Bing Map Map Plant State TX County Newton Balancing Authority Code MISO Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 40.5 Net Summer Capacity (MW) 40 Net Winter Capacity (MW) 40 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 2 Operating Year 1969 Status (OP) Operating Latitude 31.173484 Longitude -93.56588 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:6765
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:6770
Sources EV-c79fd24fdd68161117a79713 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 85533a1d24d9f237672c0765bbc7a3b69b6e508ad321e3bbb8fda95ed9e086e6 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:6765
Sources EV-bafe5a868cf60f628d254b2e Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 29a09b3d8c134270640f2897e80109ae7ffe6e4dd56f146d76ceecd785d2547e Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Toledo Bend / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 55937 Utility Name Entergy Texas Inc. Plant Code 6595 Plant Name Toledo Bend State TX County Newton Generator ID 1 Technology Conventional Hydroelectric Prime Mover HY Ownership J Duct Burners X Can Bypass Heat Recovery Steam Generator? X RTO/ISO LMP Node Designation EES.TOL_BEND1 Nameplate Capacity (MW) 40.5 Nameplate Power Factor 0.95 Summer Capacity (MW) 40 Winter Capacity (MW) 40 Minimum Load (MW) 32 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 2 Operating Year 1969 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 WAT Solid Fuel Gasification System? N Time from Cold Shutdown to Full Load 10M Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:6770
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:6770
Sources EV-c79fd24fdd68161117a79713 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 85533a1d24d9f237672c0765bbc7a3b69b6e508ad321e3bbb8fda95ed9e086e6 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Toledo Bend / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 55937 Entity Name Entergy Texas Inc. Plant ID 6595 Plant Name Toledo Bend Google Map Map Bing Map Map Plant State TX County Newton Balancing Authority Code MISO Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 40.5 Net Summer Capacity (MW) 40 Net Winter Capacity (MW) 40 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 2 Operating Year 1969 Status (OP) Operating Latitude 31.173484 Longitude -93.56588 Original text (OP) Operating source_record_id Operating:6765
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:6765
Sources EV-bafe5a868cf60f628d254b2e Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 29a09b3d8c134270640f2897e80109ae7ffe6e4dd56f146d76ceecd785d2547e Usage terms US government public domain