POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Octans / OCTNS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)125 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-69c16e78957b548f4eb030b2
Net Summer Capacity (MW)125 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-69c16e78957b548f4eb030b2
Net Winter Capacity (MW)125 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-69c16e78957b548f4eb030b2
Detailed source fields
Original source fieldPublished value or condition
Entity ID56201
Entity NameEngie North America
Plant ID65590
Plant NameOctans
Google MapMap
Bing MapMap
Plant StateTX
CountyPecos
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDOCTNS
Nameplate Capacity (MW)125
Net Summer Capacity (MW)125
Net Winter Capacity (MW)125
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2028
Status(U) Under construction, less than or equal to 50 percent complete
Latitude31.000575
Longitude-102.6799
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1756

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:536

Sources EV-02d4ef4f75aee4b8cb06edfc
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 601c1d52d241c00280f89f94fe7b55019b4b74ad5269e4e20776f9ebb25cc75f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1756

Sources EV-69c16e78957b548f4eb030b2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 877065fb4be8583e0c404cbc3e0628374cac72f416ce14b091c33ae01cdca4b8

Usage terms US government public domain

Source snapshots by date · USA · eia860

Octans / OCTNS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID56201
Utility NameEngie North America
Plant Code65590
Plant NameOctans
StateTX
CountyPecos
Generator IDOCTNS
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)125
Nameplate Power Factor0.95
Summer Capacity (MW)125
Winter Capacity (MW)125
StatusU
Effective Month6
Effective Year2024
Current Month12
Current Year2028
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:536

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:536

Sources EV-02d4ef4f75aee4b8cb06edfc
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 601c1d52d241c00280f89f94fe7b55019b4b74ad5269e4e20776f9ebb25cc75f

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Octans / OCTNS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID56201
Entity NameEngie North America
Plant ID65590
Plant NameOctans
Google MapMap
Bing MapMap
Plant StateTX
CountyPecos
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDOCTNS
Nameplate Capacity (MW)125
Net Summer Capacity (MW)125
Net Winter Capacity (MW)125
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2028
Status(U) Under construction, less than or equal to 50 percent complete
Latitude31.000575
Longitude-102.6799
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:1756

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1756

Sources EV-69c16e78957b548f4eb030b2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 877065fb4be8583e0c404cbc3e0628374cac72f416ce14b091c33ae01cdca4b8

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel