POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Meridian Wind Park / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 225 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f63780bea0513e6ce4384d15 Net Summer Capacity (MW) 225 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f63780bea0513e6ce4384d15 Net Winter Capacity (MW) 225 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f63780bea0513e6ce4384d15
Detailed source fields Original source field Published value or condition Entity ID 5109 Entity Name DTE Electric Company Plant ID 65328 Plant Name Meridian Wind Park Google Map Map Bing Map Map Plant State MI County Gratiot Balancing Authority Code MISO Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 225 Net Summer Capacity (MW) 225 Net Winter Capacity (MW) 225 Technology Onshore Wind Turbine Energy Source Code WND Prime Mover Code WT Operating Month 4 Operating Year 2023 Status (OP) Operating Latitude 43.461967 Longitude -84.33982 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:23909
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:23892
Sources EV-68847981c71a44e27b392d03 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 973cffe18e7738b568d73d54c49b6e4640f142779daa62d6c3465673ed13e634 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:23909
Sources EV-f63780bea0513e6ce4384d15 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 43313be69edd36fa229519977f318e41862f577eb4dc594c3dbf3b57244f4013 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Meridian Wind Park / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 5109 Entity Name DTE Electric Company Plant ID 65328 Plant Name Meridian Wind Park Google Map Map Bing Map Map Plant State MI County Gratiot Balancing Authority Code MISO Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 225 Net Summer Capacity (MW) 225 Net Winter Capacity (MW) 225 Technology Onshore Wind Turbine Energy Source Code WND Prime Mover Code WT Operating Month 4 Operating Year 2023 Status (OP) Operating Latitude 43.461967 Longitude -84.33982 Original text (OP) Operating source_record_id Operating:23909
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:23909
Sources EV-f63780bea0513e6ce4384d15 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 43313be69edd36fa229519977f318e41862f577eb4dc594c3dbf3b57244f4013 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Meridian Wind Park / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 5109 Utility Name DTE Electric Company Plant Code 65328 Plant Name Meridian Wind Park State MI County Gratiot Generator ID 1 Technology Onshore Wind Turbine Prime Mover WT Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 225 Summer Capacity (MW) 225 Winter Capacity (MW) 225 Minimum Load (MW) 6 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 4 Operating Year 2023 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 WND Turbines or Hydrokinetic Buoys 77 Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:23892
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:23892
Sources EV-68847981c71a44e27b392d03 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 973cffe18e7738b568d73d54c49b6e4640f142779daa62d6c3465673ed13e634 Usage terms US government public domain
Observations for this power asset