Power assets and projects · USA · eia860m

New Rosewood BESS / BAT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b5c6bc373514dc3a71f55a17
Net Summer Capacity (MW)2.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b5c6bc373514dc3a71f55a17
Net Winter Capacity (MW)2.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b5c6bc373514dc3a71f55a17
Nameplate Energy Capacity (MWh)10 MWhOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b5c6bc373514dc3a71f55a17
Detailed source fields
Original source fieldPublished value or condition
Entity ID13683
Entity NameNorth Carolina El Member Corp
Plant ID65243
Plant NameNew Rosewood BESS
Google MapMap
Bing MapMap
Plant StateNC
CountyWayne
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDBAT1
Nameplate Capacity (MW)2.5
Net Summer Capacity (MW)2.5
Net Winter Capacity (MW)2.5
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Operating Month12
Operating Year2024
Status(OP) Operating
Nameplate Energy Capacity (MWh)10
Latitude35.436188
Longitude-78.10965
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:23815

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:23798

Sources EV-43f2d9f34d8d71e76d8f7ce6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6760f908e43825d08283ffba0c399b83a9faf59ed3b6ec98a747586c29d3dfb2

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:23815

Sources EV-b5c6bc373514dc3a71f55a17
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3a9a7c7746cbd2b84844b8d79f08e82a7b143e18baf4ceb93f9e0af111e0e7cd

Usage terms US government public domain

Source snapshots by date · USA · eia860

New Rosewood BESS / BAT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13683
Utility NameNorth Carolina El Member Corp
Plant Code65243
Plant NameNew Rosewood BESS
StateNC
CountyWayne
Generator IDBAT1
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2.5
Nameplate Power Factor1
Summer Capacity (MW)2.5
Winter Capacity (MW)2.5
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year2024
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1MWH
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:23798

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:23798

Sources EV-43f2d9f34d8d71e76d8f7ce6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6760f908e43825d08283ffba0c399b83a9faf59ed3b6ec98a747586c29d3dfb2

Usage terms US government public domain

Source snapshots by date · USA · eia860m

New Rosewood BESS / BAT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13683
Entity NameNorth Carolina El Member Corp
Plant ID65243
Plant NameNew Rosewood BESS
Google MapMap
Bing MapMap
Plant StateNC
CountyWayne
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDBAT1
Nameplate Capacity (MW)2.5
Net Summer Capacity (MW)2.5
Net Winter Capacity (MW)2.5
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Operating Month12
Operating Year2024
Status(OP) Operating
Nameplate Energy Capacity (MWh)10
Latitude35.436188
Longitude-78.10965
Original text(OP) Operating
source_record_idOperating:23815

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:23815

Sources EV-b5c6bc373514dc3a71f55a17
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3a9a7c7746cbd2b84844b8d79f08e82a7b143e18baf4ceb93f9e0af111e0e7cd

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel