Power assets and projects · USA · eia860m

Certain Solar - Staten Island / CTS0D

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e4d84d6ece42d705c32471e8
Net Summer Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e4d84d6ece42d705c32471e8
Net Winter Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e4d84d6ece42d705c32471e8
Detailed source fields
Original source fieldPublished value or condition
Entity ID57128
Entity NameBloom Energy
Plant ID65201
Plant NameCertain Solar - Staten Island
Google MapMap
Bing MapMap
Plant StateNY
CountyRichmond
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDCTS0D
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month9
Operating Year2020
Status(OP) Operating
Latitude40.540416
Longitude-74.17685
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:23777

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:23760

Sources EV-793ce7daeea9cf4457dd7728
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e0b17876e6fec348389def070eb01e540ec675adebbe1707d15bfb8885218d59

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:23777

Sources EV-e4d84d6ece42d705c32471e8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 13b4ecc264a18312fc5619a1aa8f96fb7ccf71da1403c5c6fb04bd4de5b8613e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Certain Solar - Staten Island / CTS0D

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID57128
Utility NameBloom Energy
Plant Code65201
Plant NameCertain Solar - Staten Island
StateNY
CountyRichmond
Generator IDCTS0D
TechnologyOther Natural Gas
Prime MoverFC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2
Summer Capacity (MW)2
Winter Capacity (MW)2
Minimum Load (MW)2
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month9
Operating Year2020
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NG
Time from Cold Shutdown to Full LoadOVER
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:23760

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:23760

Sources EV-793ce7daeea9cf4457dd7728
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e0b17876e6fec348389def070eb01e540ec675adebbe1707d15bfb8885218d59

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Certain Solar - Staten Island / CTS0D

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID57128
Entity NameBloom Energy
Plant ID65201
Plant NameCertain Solar - Staten Island
Google MapMap
Bing MapMap
Plant StateNY
CountyRichmond
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDCTS0D
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month9
Operating Year2020
Status(OP) Operating
Latitude40.540416
Longitude-74.17685
Original text(OP) Operating
source_record_idOperating:23777

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:23777

Sources EV-e4d84d6ece42d705c32471e8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 13b4ecc264a18312fc5619a1aa8f96fb7ccf71da1403c5c6fb04bd4de5b8613e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel