POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Vergennes 9 / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5abdf9edb3614d3ee789b59b
Net Summer Capacity (MW)0.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5abdf9edb3614d3ee789b59b
Net Winter Capacity (MW)0.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5abdf9edb3614d3ee789b59b
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID6519
Plant NameVergennes 9
Google MapMap
Bing MapMap
Plant StateVT
CountyAddison
Balancing Authority CodeISNE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)0.7
Net Summer Capacity (MW)0.7
Net Winter Capacity (MW)0.7
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1912
Status(OP) Operating
Latitude44.1664
Longitude-73.2575
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6672

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6677

Sources EV-c638c4358075451793a9ad28
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8d58e305f0d3dddae07a11e1bee06b3096fa039667637dd1fc8b089727e4c51c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6672

Sources EV-5abdf9edb3614d3ee789b59b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e4fdc35b1b3644aa9ff7be7ded1999792ff9614de98348da6b833b0f39464f26

Usage terms US government public domain

Source snapshots by date · USA · eia860

Vergennes 9 / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7601
Utility NameGreen Mountain Power Corp
Plant Code6519
Plant NameVergennes 9
StateVT
CountyAddison
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.7
Nameplate Power Factor0.8
Summer Capacity (MW)0.7
Winter Capacity (MW)0.7
Minimum Load (MW)0.2
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month1
Operating Year1912
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6677

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6677

Sources EV-c638c4358075451793a9ad28
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8d58e305f0d3dddae07a11e1bee06b3096fa039667637dd1fc8b089727e4c51c

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Vergennes 9 / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID6519
Plant NameVergennes 9
Google MapMap
Bing MapMap
Plant StateVT
CountyAddison
Balancing Authority CodeISNE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)0.7
Net Summer Capacity (MW)0.7
Net Winter Capacity (MW)0.7
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1912
Status(OP) Operating
Latitude44.1664
Longitude-73.2575
Original text(OP) Operating
source_record_idOperating:6672

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6672

Sources EV-5abdf9edb3614d3ee789b59b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e4fdc35b1b3644aa9ff7be7ded1999792ff9614de98348da6b833b0f39464f26

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel