Power assets and projects · USA · eia860m
AES West Oahu Solar Hybrid / UHWO
Generator · Operations
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
12.5 MW
Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-03edf0606a8b5b1d8f4877a6
Net Summer Capacity (MW)
12.5 MW
Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-03edf0606a8b5b1d8f4877a6
Net Winter Capacity (MW)
12.5 MW
Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-03edf0606a8b5b1d8f4877a6
DC Net Capacity (MW)
18.25 MWdc