POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Beldens / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e0db82e35bf81e3e090d83ee
Net Summer Capacity (MW)0.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e0db82e35bf81e3e090d83ee
Net Winter Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e0db82e35bf81e3e090d83ee
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID6451
Plant NameBeldens
Google MapMap
Bing MapMap
Plant StateVT
CountyAddison
Balancing Authority CodeISNE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.6
Net Winter Capacity (MW)0.8
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month8
Operating Year1913
Status(OP) Operating
Latitude44.0525
Longitude-73.1762
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6576

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6581

Sources EV-ad7a0fc3947e6c5f7990cb73
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 775b957b88e9d3fa225e184df4047a84187aba101d6e2fe70b4e09967093c514

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6576

Sources EV-e0db82e35bf81e3e090d83ee
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0e2074d0d3a2171e319043078723763d9e10094e7252c670d17eacf1962cde5c

Usage terms US government public domain

Source snapshots by date · USA · eia860

Beldens / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7601
Utility NameGreen Mountain Power Corp
Plant Code6451
Plant NameBeldens
StateVT
CountyAddison
Generator ID1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.8
Nameplate Power Factor0.8
Summer Capacity (MW)0.6
Winter Capacity (MW)0.8
Minimum Load (MW)0.2
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month8
Operating Year1913
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6581

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6581

Sources EV-ad7a0fc3947e6c5f7990cb73
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 775b957b88e9d3fa225e184df4047a84187aba101d6e2fe70b4e09967093c514

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Beldens / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID6451
Plant NameBeldens
Google MapMap
Bing MapMap
Plant StateVT
CountyAddison
Balancing Authority CodeISNE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.6
Net Winter Capacity (MW)0.8
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month8
Operating Year1913
Status(OP) Operating
Latitude44.0525
Longitude-73.1762
Original text(OP) Operating
source_record_idOperating:6576

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6576

Sources EV-e0db82e35bf81e3e090d83ee
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0e2074d0d3a2171e319043078723763d9e10094e7252c670d17eacf1962cde5c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel