Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Highland Solar South / 9999
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
74.9 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-da559a61a801eb838fb7bd6b
Net Summer Capacity (MW)
74.9 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-da559a61a801eb838fb7bd6b
Net Winter Capacity (MW)
74.9 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-da559a61a801eb838fb7bd6b
Detailed source fields
Original source field
Published value or condition
Entity ID
63969
Entity Name
Placid Solar, LLC
Plant ID
64346
Plant Name
Highland Solar South
Google Map
Map
Bing Map
Map
Plant State
FL
County
Highlands
Balancing Authority Code
FPC
Sector
IPP Non-CHP
Generator ID
9999
Nameplate Capacity (MW)
74.9
Net Summer Capacity (MW)
74.9
Net Winter Capacity (MW)
74.9
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
9
Planned Operation Year
2026
Status
(V) Under construction, more than 50 percent complete
Latitude
27.2664
Longitude
-81.4082
Original text
(V) Under construction, more than 50 percent complete