Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Pueblo BA / PBL1 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 9.9 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b60405f87c0ebc0d13b26993 Net Summer Capacity (MW) 9.9 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b60405f87c0ebc0d13b26993 Net Winter Capacity (MW) 9.9 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b60405f87c0ebc0d13b26993 Nameplate Energy Capacity (MWh) 9.9 MWh Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b60405f87c0ebc0d13b26993
Detailed source fields Original source field Published value or condition Entity ID 56201 Entity Name Engie North America Plant ID 64318 Plant Name Pueblo BA Google Map Map Bing Map Map Plant State TX County Maverick Balancing Authority Code ERCO Sector IPP Non-CHP Generator ID PBL1 Nameplate Capacity (MW) 9.9 Net Summer Capacity (MW) 9.9 Net Winter Capacity (MW) 9.9 Technology Batteries Energy Source Code MWH Prime Mover Code BA Operating Month 3 Operating Year 2022 Status (OP) Operating Nameplate Energy Capacity (MWh) 9.9 Latitude 28.678935 Longitude -100.4637 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:22724
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:22712
Sources EV-0b51a399df61f05a5ba844cc Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 64571024fc13502b31fcf9011df98bc09aafcb7159dfb6ebeb397d98acd75ffa Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:22724
Sources EV-b60405f87c0ebc0d13b26993 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 611d8e74ed79b9f9d6e01f84fc654805183b46f46df99a5e5eb653175d02dc64 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Pueblo BA / PBL1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 56201 Utility Name Engie North America Plant Code 64318 Plant Name Pueblo BA State TX County Maverick Generator ID PBL1 Technology Batteries Prime Mover BA Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 9.9 Nameplate Power Factor 0.95 Summer Capacity (MW) 9.9 Winter Capacity (MW) 9.9 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 3 Operating Year 2022 Associated with Combined Heat and Power System N Sector Name IPP Non-CHP Sector 2 Topping or Bottoming X Energy Source 1 MWH Time from Cold Shutdown to Full Load 10M Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:22712
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:22712
Sources EV-0b51a399df61f05a5ba844cc Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 64571024fc13502b31fcf9011df98bc09aafcb7159dfb6ebeb397d98acd75ffa Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Pueblo BA / PBL1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 56201 Entity Name Engie North America Plant ID 64318 Plant Name Pueblo BA Google Map Map Bing Map Map Plant State TX County Maverick Balancing Authority Code ERCO Sector IPP Non-CHP Generator ID PBL1 Nameplate Capacity (MW) 9.9 Net Summer Capacity (MW) 9.9 Net Winter Capacity (MW) 9.9 Technology Batteries Energy Source Code MWH Prime Mover Code BA Operating Month 3 Operating Year 2022 Status (OP) Operating Nameplate Energy Capacity (MWh) 9.9 Latitude 28.678935 Longitude -100.4637 Original text (OP) Operating source_record_id Operating:22724
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:22724
Sources EV-b60405f87c0ebc0d13b26993 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 611d8e74ed79b9f9d6e01f84fc654805183b46f46df99a5e5eb653175d02dc64 Usage terms US government public domain