Power assets and projects · USA · eia860m

SSD Clackamas 4, LLC / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ebf799a793fa5e9150fd2735
Net Summer Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ebf799a793fa5e9150fd2735
Net Winter Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ebf799a793fa5e9150fd2735
DC Net Capacity (MW)3.2 MWdcOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ebf799a793fa5e9150fd2735
Detailed source fields
Original source fieldPublished value or condition
Entity ID63623
Entity NameThor Solar 1 CEI, LLC
Plant ID63962
Plant NameSSD Clackamas 4, LLC
Google MapMap
Bing MapMap
Plant StateOR
CountyClackamas
Balancing Authority CodePGE
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month12
Operating Year2020
Status(OP) Operating
DC Net Capacity (MW)3.2
Latitude45.102
Longitude-122.662
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:22368

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:22356

Sources EV-d2d895292d11386fa54017dd
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8e740ce2da0e79de2cac79edf52461362f048921aa94c60ea7565af6a037169e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:22368

Sources EV-ebf799a793fa5e9150fd2735
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4c050463799550677bc13a3cdab41e77f0d67c56b9dd7dfdeac4ffb39b9ea194

Usage terms US government public domain

Source snapshots by date · USA · eia860m

SSD Clackamas 4, LLC / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID63623
Entity NameThor Solar 1 CEI, LLC
Plant ID63962
Plant NameSSD Clackamas 4, LLC
Google MapMap
Bing MapMap
Plant StateOR
CountyClackamas
Balancing Authority CodePGE
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month12
Operating Year2020
Status(OP) Operating
DC Net Capacity (MW)3.2
Latitude45.102
Longitude-122.662
Original text(OP) Operating
source_record_idOperating:22368

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:22368

Sources EV-ebf799a793fa5e9150fd2735
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4c050463799550677bc13a3cdab41e77f0d67c56b9dd7dfdeac4ffb39b9ea194

Usage terms US government public domain

Source snapshots by date · USA · eia860

SSD Clackamas 4, LLC / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID63623
Utility NameThor Solar 1 CEI, LLC
Plant Code63962
Plant NameSSD Clackamas 4, LLC
StateOR
CountyClackamas
Generator ID1
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2
Nameplate Power Factor1
Summer Capacity (MW)2
Winter Capacity (MW)2
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year2020
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1SUN
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:22356

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:22356

Sources EV-d2d895292d11386fa54017dd
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8e740ce2da0e79de2cac79edf52461362f048921aa94c60ea7565af6a037169e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel