POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Solar BESS Hybrid / GEN03

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-8aecbebc89d9025d3ae985ea
Net Summer Capacity (MW)2 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-8aecbebc89d9025d3ae985ea
Net Winter Capacity (MW)2 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-8aecbebc89d9025d3ae985ea
Detailed source fields
Original source fieldPublished value or condition
Entity ID63260
Entity NameCobb Electric Membership Corporation
Plant ID63535
Plant NameSolar BESS Hybrid
Google MapMap
Bing MapMap
Plant StateGA
CountyCobb
Balancing Authority CodeSOCO
SectorElectric Utility
Generator IDGEN03
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month5
Planned Operation Year2027
Status(V) Under construction, more than 50 percent complete
Latitude33.979348
Longitude-84.55613
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:803

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:375

Sources EV-1becd922fa733322703b2709
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c5b50967aac57b32683160095b616900efd62034109a7bd2181cdf17a4933115

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:803

Sources EV-8aecbebc89d9025d3ae985ea
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f06569b2f96cbe4a3503178b126afa9613f7168bde9edbc85022541e1035d46d

Usage terms US government public domain

Source snapshots by date · USA · eia860

Solar BESS Hybrid / GEN03

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID63260
Utility NameCobb Electric Membership Corporation
Plant Code63535
Plant NameSolar BESS Hybrid
StateGA
CountyCobb
Generator IDGEN03
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2
Nameplate Power Factor1
Summer Capacity (MW)2
Winter Capacity (MW)2
StatusU
Effective Month5
Effective Year2027
Current Month5
Current Year2027
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Multiple Fuels?N
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:375

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:375

Sources EV-1becd922fa733322703b2709
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c5b50967aac57b32683160095b616900efd62034109a7bd2181cdf17a4933115

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Solar BESS Hybrid / GEN03

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID63260
Entity NameCobb Electric Membership Corporation
Plant ID63535
Plant NameSolar BESS Hybrid
Google MapMap
Bing MapMap
Plant StateGA
CountyCobb
Balancing Authority CodeSOCO
SectorElectric Utility
Generator IDGEN03
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month5
Planned Operation Year2027
Status(V) Under construction, more than 50 percent complete
Latitude33.979348
Longitude-84.55613
Original text(V) Under construction, more than 50 percent complete
source_record_idPlanned:803

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:803

Sources EV-8aecbebc89d9025d3ae985ea
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f06569b2f96cbe4a3503178b126afa9613f7168bde9edbc85022541e1035d46d

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel