Power assets and projects · USA · eia860m

CED Mason City Wind / MCW1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)7.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-7d88c0f6b4521dc47f17f18a
Net Summer Capacity (MW)7.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-7d88c0f6b4521dc47f17f18a
Net Winter Capacity (MW)7.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-7d88c0f6b4521dc47f17f18a
Detailed source fields
Original source fieldPublished value or condition
Entity ID67192
Entity NameRWE Clean Energy
Plant ID63521
Plant NameCED Mason City Wind
Google MapMap
Bing MapMap
Plant StateIA
CountyCerro Gordo
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDMCW1
Nameplate Capacity (MW)7.5
Net Summer Capacity (MW)7.9
Net Winter Capacity (MW)7.9
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month5
Operating Year2020
Status(OP) Operating
Latitude43.140697
Longitude-93.09848
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:21867

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21859

Sources EV-4afaa911b522906de76313d4
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0364c42dc0db06261ddced716e1f031a3aea27d3f5dc299e6f6f2f812c0da610

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21867

Sources EV-7d88c0f6b4521dc47f17f18a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c245c9312b434602b12d27c5d930f73fcbf947ff877e5c759f8e883d2b5b11ce

Usage terms US government public domain

Source snapshots by date · USA · eia860m

CED Mason City Wind / MCW1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID67192
Entity NameRWE Clean Energy
Plant ID63521
Plant NameCED Mason City Wind
Google MapMap
Bing MapMap
Plant StateIA
CountyCerro Gordo
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDMCW1
Nameplate Capacity (MW)7.5
Net Summer Capacity (MW)7.9
Net Winter Capacity (MW)7.9
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month5
Operating Year2020
Status(OP) Operating
Latitude43.140697
Longitude-93.09848
Original text(OP) Operating
source_record_idOperating:21867

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21867

Sources EV-7d88c0f6b4521dc47f17f18a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c245c9312b434602b12d27c5d930f73fcbf947ff877e5c759f8e883d2b5b11ce

Usage terms US government public domain

Source snapshots by date · USA · eia860

CED Mason City Wind / MCW1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID67192
Utility NameRWE Clean Energy
Plant Code63521
Plant NameCED Mason City Wind
StateIA
CountyCerro Gordo
Generator IDMCW1
TechnologyOnshore Wind Turbine
Prime MoverWT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)7.5
Summer Capacity (MW)7.9
Winter Capacity (MW)7.9
Minimum Load (MW)0
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month5
Operating Year2020
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WND
Turbines or Hydrokinetic Buoys3
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:21859

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21859

Sources EV-4afaa911b522906de76313d4
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0364c42dc0db06261ddced716e1f031a3aea27d3f5dc299e6f6f2f812c0da610

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel