POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Moonlight Packing - Phase 2 / MLO2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0d693258763469ec472d150b
Net Summer Capacity (MW)1.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0d693258763469ec472d150b
Net Winter Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0d693258763469ec472d150b
DC Net Capacity (MW)1.8 MWdcOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0d693258763469ec472d150b
Detailed source fields
Original source fieldPublished value or condition
Entity ID63226
Entity NameCalCom Energy
Plant ID63514
Plant NameMoonlight Packing - Phase 2
Google MapMap
Bing MapMap
Plant StateCA
CountyFresno
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDMLO2
Nameplate Capacity (MW)1.4
Net Summer Capacity (MW)1.4
Net Winter Capacity (MW)1
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month6
Operating Year2019
Status(OP) Operating
DC Net Capacity (MW)1.8
Latitude36.585794
Longitude-119.47
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:21861

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21853

Sources EV-15df73e361e6263c7a6f1b09
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1a914aba416b026fd9412ee0581993dd5f8986584c4dea4d1c300a6be6414584

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21861

Sources EV-0d693258763469ec472d150b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5eab3ce1f7857ec43296fd73839b8c8b563e8b644be38cd6d3579d3bd22e50b7

Usage terms US government public domain

Source snapshots by date · USA · eia860

Moonlight Packing - Phase 2 / MLO2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID63226
Utility NameCalCom Energy
Plant Code63514
Plant NameMoonlight Packing - Phase 2
StateCA
CountyFresno
Generator IDMLO2
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.4
Summer Capacity (MW)1.4
Winter Capacity (MW)1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year2019
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1SUN
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:21853

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21853

Sources EV-15df73e361e6263c7a6f1b09
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1a914aba416b026fd9412ee0581993dd5f8986584c4dea4d1c300a6be6414584

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Moonlight Packing - Phase 2 / MLO2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID63226
Entity NameCalCom Energy
Plant ID63514
Plant NameMoonlight Packing - Phase 2
Google MapMap
Bing MapMap
Plant StateCA
CountyFresno
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDMLO2
Nameplate Capacity (MW)1.4
Net Summer Capacity (MW)1.4
Net Winter Capacity (MW)1
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month6
Operating Year2019
Status(OP) Operating
DC Net Capacity (MW)1.8
Latitude36.585794
Longitude-119.47
Original text(OP) Operating
source_record_idOperating:21861

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21861

Sources EV-0d693258763469ec472d150b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5eab3ce1f7857ec43296fd73839b8c8b563e8b644be38cd6d3579d3bd22e50b7

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel