Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Pinon Energy Center / GT1
Generator · Cancelled or postponed
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
41.8 MW
Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-f4115677b9b587d2fd9813d0
Net Summer Capacity (MW)
42.3 MW
Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-f4115677b9b587d2fd9813d0
Net Winter Capacity (MW)
42.8 MW
Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-f4115677b9b587d2fd9813d0