POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Brightside / UNIT1 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 50.7 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-fafa560269e952fa6bdf0d74 Net Summer Capacity (MW) 50.7 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-fafa560269e952fa6bdf0d74 Net Winter Capacity (MW) 50.7 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-fafa560269e952fa6bdf0d74 DC Net Capacity (MW) 65 MWdc Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-fafa560269e952fa6bdf0d74
Detailed source fields Original source field Published value or condition Entity ID 55983 Entity Name Luminant Generation Company LLC Plant ID 63223 Plant Name Brightside Google Map Map Bing Map Map Plant State TX County Bee Balancing Authority Code ERCO Sector IPP Non-CHP Generator ID UNIT1 Nameplate Capacity (MW) 50.7 Net Summer Capacity (MW) 50.7 Net Winter Capacity (MW) 50.7 Technology Solar Photovoltaic Energy Source Code SUN Prime Mover Code PV Operating Month 5 Operating Year 2022 Status (OP) Operating DC Net Capacity (MW) 65 Latitude 28.430988 Longitude -97.88956 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:21549
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:21541
Sources EV-4cceac565164914384ae43e2 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 4372a4018f93c84c0968da7ab6ba3811d859fc1782202ffb848b7479b575203a Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:21549
Sources EV-fafa560269e952fa6bdf0d74 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 6ec06e3bfb44a0e8b48de31f0251c10c5b4204f5635f3c20eb2779833f6eda27 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Brightside / UNIT1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 55983 Utility Name Luminant Generation Company LLC Plant Code 63223 Plant Name Brightside State TX County Bee Generator ID UNIT1 Technology Solar Photovoltaic Prime Mover PV Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 50.7 Nameplate Power Factor 0.9 Summer Capacity (MW) 50.7 Winter Capacity (MW) 50.7 Minimum Load (MW) 0 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 5 Operating Year 2022 Associated with Combined Heat and Power System N Sector Name IPP Non-CHP Sector 2 Topping or Bottoming X Energy Source 1 SUN Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:21541
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:21541
Sources EV-4cceac565164914384ae43e2 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 4372a4018f93c84c0968da7ab6ba3811d859fc1782202ffb848b7479b575203a Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Brightside / UNIT1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 55983 Entity Name Luminant Generation Company LLC Plant ID 63223 Plant Name Brightside Google Map Map Bing Map Map Plant State TX County Bee Balancing Authority Code ERCO Sector IPP Non-CHP Generator ID UNIT1 Nameplate Capacity (MW) 50.7 Net Summer Capacity (MW) 50.7 Net Winter Capacity (MW) 50.7 Technology Solar Photovoltaic Energy Source Code SUN Prime Mover Code PV Operating Month 5 Operating Year 2022 Status (OP) Operating DC Net Capacity (MW) 65 Latitude 28.430988 Longitude -97.88956 Original text (OP) Operating source_record_id Operating:21549
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:21549
Sources EV-fafa560269e952fa6bdf0d74 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 6ec06e3bfb44a0e8b48de31f0251c10c5b4204f5635f3c20eb2779833f6eda27 Usage terms US government public domain