Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Tip Top Solar Energy Center LLC / GEN1
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
220 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-fdf2f33b94f98f74b1b17d13
Net Summer Capacity (MW)
220 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-fdf2f33b94f98f74b1b17d13
Net Winter Capacity (MW)
220 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-fdf2f33b94f98f74b1b17d13
Detailed source fields
Original source field
Published value or condition
Entity ID
49893
Entity Name
Invenergy Services LLC
Plant ID
63028
Plant Name
Tip Top Solar Energy Center LLC
Google Map
Map
Bing Map
Map
Plant State
NM
County
Lea
Balancing Authority Code
SWPP
Sector
IPP Non-CHP
Generator ID
GEN1
Nameplate Capacity (MW)
220
Net Summer Capacity (MW)
220
Net Winter Capacity (MW)
220
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
12
Planned Operation Year
2026
Status
(V) Under construction, more than 50 percent complete
Latitude
32.133136
Longitude
-103.3235
Original text
(V) Under construction, more than 50 percent complete