Crystal River / CC1ST

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)364.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8a9fd49d22797a7f73735ff5
Net Summer Capacity (MW)322 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8a9fd49d22797a7f73735ff5
Net Winter Capacity (MW)335 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8a9fd49d22797a7f73735ff5
Detailed source fields
Original source fieldPublished value or condition
Entity ID6455
Entity NameDuke Energy Florida, LLC
Plant ID628
Plant NameCrystal River
Google MapMap
Bing MapMap
Plant StateFL
CountyCitrus
Balancing Authority CodeFPC
SectorElectric Utility
Generator IDCC1ST
Unit CodeCC1
Nameplate Capacity (MW)364.7
Net Summer Capacity (MW)322
Net Winter Capacity (MW)335
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month10
Operating Year2018
Status(OP) Operating
Latitude28.9656
Longitude-82.6977
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1053

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1047

Sources EV-1c149d317bff78c291ece3c1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 34b3ad359c76e3de3c54e70e2b8adc58c5672077edf403489c60a8aec9de5ee5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1053

Sources EV-8a9fd49d22797a7f73735ff5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 26c56796b10542665148d83c9efb9af1e430bd6ba6a6fc37983e843317a7fad5

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Crystal River / CC1ST

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID6455
Entity NameDuke Energy Florida, LLC
Plant ID628
Plant NameCrystal River
Google MapMap
Bing MapMap
Plant StateFL
CountyCitrus
Balancing Authority CodeFPC
SectorElectric Utility
Generator IDCC1ST
Unit CodeCC1
Nameplate Capacity (MW)364.7
Net Summer Capacity (MW)322
Net Winter Capacity (MW)335
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month10
Operating Year2018
Status(OP) Operating
Latitude28.9656
Longitude-82.6977
Original text(OP) Operating
source_record_idOperating:1053

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1053

Sources EV-8a9fd49d22797a7f73735ff5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 26c56796b10542665148d83c9efb9af1e430bd6ba6a6fc37983e843317a7fad5

Usage terms US government public domain

Source snapshots by date · USA · eia860

Crystal River / CC1ST

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID6455
Utility NameDuke Energy Florida, LLC
Plant Code628
Plant NameCrystal River
StateFL
CountyCitrus
Generator IDCC1ST
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCA
Unit CodeCC1
OwnershipS
Duct BurnersY
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)364.7
Nameplate Power Factor0.85
Summer Capacity (MW)322
Winter Capacity (MW)335
Minimum Load (MW)322
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month10
Operating Year2018
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:1047

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1047

Sources EV-1c149d317bff78c291ece3c1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 34b3ad359c76e3de3c54e70e2b8adc58c5672077edf403489c60a8aec9de5ee5

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel