POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Crystal River / 1GTB Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 310.3 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-fa440ba6cac4e642c8d3f48a Net Summer Capacity (MW) 242 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-fa440ba6cac4e642c8d3f48a Net Winter Capacity (MW) 295 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-fa440ba6cac4e642c8d3f48a
Detailed source fields Original source field Published value or condition Entity ID 6455 Entity Name Duke Energy Florida, LLC Plant ID 628 Plant Name Crystal River Google Map Map Bing Map Map Plant State FL County Citrus Balancing Authority Code FPC Sector Electric Utility Generator ID 1GTB Unit Code CC1 Nameplate Capacity (MW) 310.3 Net Summer Capacity (MW) 242 Net Winter Capacity (MW) 295 Technology Natural Gas Fired Combined Cycle Energy Source Code NG Prime Mover Code CT Operating Month 10 Operating Year 2018 Status (OP) Operating Latitude 28.9656 Longitude -82.6977 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:1049
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:1043
Sources EV-dc8589b38e04e09a1357d1df Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 e7b4a3dc33ba5ce8d4293c90423b59e4ec1bc86073b8ba14ab5667fcfd57f27b Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:1049
Sources EV-fa440ba6cac4e642c8d3f48a Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 353059f64332b4e93bd2a5815e2d5c30b8b37b8268dae3d9882a52baf4fe8280 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Crystal River / 1GTB Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 6455 Entity Name Duke Energy Florida, LLC Plant ID 628 Plant Name Crystal River Google Map Map Bing Map Map Plant State FL County Citrus Balancing Authority Code FPC Sector Electric Utility Generator ID 1GTB Unit Code CC1 Nameplate Capacity (MW) 310.3 Net Summer Capacity (MW) 242 Net Winter Capacity (MW) 295 Technology Natural Gas Fired Combined Cycle Energy Source Code NG Prime Mover Code CT Operating Month 10 Operating Year 2018 Status (OP) Operating Latitude 28.9656 Longitude -82.6977 Original text (OP) Operating source_record_id Operating:1049
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:1049
Sources EV-fa440ba6cac4e642c8d3f48a Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 353059f64332b4e93bd2a5815e2d5c30b8b37b8268dae3d9882a52baf4fe8280 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Crystal River / 1GTB Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 6455 Utility Name Duke Energy Florida, LLC Plant Code 628 Plant Name Crystal River State FL County Citrus Generator ID 1GTB Technology Natural Gas Fired Combined Cycle Prime Mover CT Unit Code CC1 Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? N Nameplate Capacity (MW) 310.3 Nameplate Power Factor 0.85 Summer Capacity (MW) 242 Winter Capacity (MW) 295 Minimum Load (MW) 242 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 10 Operating Year 2018 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 NG Time from Cold Shutdown to Full Load 12H Multiple Fuels? N Cofire Fuels? N Switch Between Oil and Natural Gas? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:1043
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:1043
Sources EV-dc8589b38e04e09a1357d1df Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 e7b4a3dc33ba5ce8d4293c90423b59e4ec1bc86073b8ba14ab5667fcfd57f27b Usage terms US government public domain
Observations for this power asset