POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Matilda Hamilton Fee Hydroelectric Stati / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-78f8ded2f77bf5b815f4699c
Net Summer Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-78f8ded2f77bf5b815f4699c
Net Winter Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-78f8ded2f77bf5b815f4699c
Detailed source fields
Original source fieldPublished value or condition
Entity ID62661
Entity NameLock 12 Hydro Partners, LLC
Plant ID62747
Plant NameMatilda Hamilton Fee Hydroelectric Stati
Google MapMap
Bing MapMap
Plant StateKY
CountyEstill
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator ID4
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month9
Operating Year2021
Status(OP) Operating
Latitude37.677484
Longitude-83.94855
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:21089

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21083

Sources EV-d25ca5aacd773e239b227483
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 633f517eb221a95cf83f579e2fa8badafcccb279fd12b980d83d7ca08fd5458c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21089

Sources EV-78f8ded2f77bf5b815f4699c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6c1aba42ae801b540ca551f0969978124bfbb3d342b7466003f5dcbbf79e7e2f

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Matilda Hamilton Fee Hydroelectric Stati / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID62661
Entity NameLock 12 Hydro Partners, LLC
Plant ID62747
Plant NameMatilda Hamilton Fee Hydroelectric Stati
Google MapMap
Bing MapMap
Plant StateKY
CountyEstill
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator ID4
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month9
Operating Year2021
Status(OP) Operating
Latitude37.677484
Longitude-83.94855
Original text(OP) Operating
source_record_idOperating:21089

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21089

Sources EV-78f8ded2f77bf5b815f4699c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6c1aba42ae801b540ca551f0969978124bfbb3d342b7466003f5dcbbf79e7e2f

Usage terms US government public domain

Source snapshots by date · USA · eia860

Matilda Hamilton Fee Hydroelectric Stati / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID62661
Utility NameLock 12 Hydro Partners, LLC
Plant Code62747
Plant NameMatilda Hamilton Fee Hydroelectric Stati
StateKY
CountyEstill
Generator ID4
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.5
Nameplate Power Factor1
Summer Capacity (MW)0.5
Winter Capacity (MW)0.5
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month9
Operating Year2021
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WAT
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:21083

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21083

Sources EV-d25ca5aacd773e239b227483
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 633f517eb221a95cf83f579e2fa8badafcccb279fd12b980d83d7ca08fd5458c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel