POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Equinix Maple Ave. Fuel Cell / EQX08 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 2 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f62e364319c9df1592c82c2a Net Summer Capacity (MW) 2 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f62e364319c9df1592c82c2a Net Winter Capacity (MW) 2 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-f62e364319c9df1592c82c2a
Detailed source fields Original source field Published value or condition Entity ID 62150 Entity Name 2016 ESA Project Company, LLC Plant ID 62705 Plant Name Equinix Maple Ave. Fuel Cell Google Map Map Bing Map Map Plant State CA County Los Angeles Balancing Authority Code CISO Sector IPP Non-CHP Generator ID EQX08 Nameplate Capacity (MW) 2 Net Summer Capacity (MW) 2 Net Winter Capacity (MW) 2 Technology Other Natural Gas Energy Source Code NG Prime Mover Code FC Operating Month 9 Operating Year 2017 Status (OP) Operating Latitude 33.92542 Longitude -118.3946 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:21049
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:21044
Sources EV-b819164bf56304a92613b474 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 b235cbcddc5be281b4ea0ade8e30f39663a17496dac86d45d8dfbf4a269a29f8 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:21049
Sources EV-f62e364319c9df1592c82c2a Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 5636e38b9b2f0b4c2b83746c3d9c00e9c54966490caf5f6eff1b3085264c5d16 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Equinix Maple Ave. Fuel Cell / EQX08 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 62150 Entity Name 2016 ESA Project Company, LLC Plant ID 62705 Plant Name Equinix Maple Ave. Fuel Cell Google Map Map Bing Map Map Plant State CA County Los Angeles Balancing Authority Code CISO Sector IPP Non-CHP Generator ID EQX08 Nameplate Capacity (MW) 2 Net Summer Capacity (MW) 2 Net Winter Capacity (MW) 2 Technology Other Natural Gas Energy Source Code NG Prime Mover Code FC Operating Month 9 Operating Year 2017 Status (OP) Operating Latitude 33.92542 Longitude -118.3946 Original text (OP) Operating source_record_id Operating:21049
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:21049
Sources EV-f62e364319c9df1592c82c2a Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 5636e38b9b2f0b4c2b83746c3d9c00e9c54966490caf5f6eff1b3085264c5d16 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Equinix Maple Ave. Fuel Cell / EQX08 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 62150 Utility Name 2016 ESA Project Company, LLC Plant Code 62705 Plant Name Equinix Maple Ave. Fuel Cell State CA County Los Angeles Generator ID EQX08 Technology Other Natural Gas Prime Mover FC Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 2 Nameplate Power Factor 0.99 Summer Capacity (MW) 2 Winter Capacity (MW) 2 Minimum Load (MW) 2 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 9 Operating Year 2017 Associated with Combined Heat and Power System N Sector Name IPP Non-CHP Sector 2 Topping or Bottoming X Energy Source 1 NG Solid Fuel Gasification System? N Carbon Capture Technology? N Turbines or Hydrokinetic Buoys 0 Time from Cold Shutdown to Full Load 12H Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:21044
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:21044
Sources EV-b819164bf56304a92613b474 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 b235cbcddc5be281b4ea0ade8e30f39663a17496dac86d45d8dfbf4a269a29f8 Usage terms US government public domain
Observations for this power asset