POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Equinix Great Oaks Blvd. Fuel Cell / EQ14A

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0889babb1690003cf9d113ec
Net Summer Capacity (MW)2.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0889babb1690003cf9d113ec
Net Winter Capacity (MW)2.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0889babb1690003cf9d113ec
Detailed source fields
Original source fieldPublished value or condition
Entity ID62150
Entity Name2016 ESA Project Company, LLC
Plant ID62702
Plant NameEquinix Great Oaks Blvd. Fuel Cell
Google MapMap
Bing MapMap
Plant StateCA
CountySanta Clara
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDEQ14A
Nameplate Capacity (MW)2.4
Net Summer Capacity (MW)2.4
Net Winter Capacity (MW)2.4
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month12
Operating Year2017
Status(OP) Operating
Latitude37.24097
Longitude-121.7826
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:21042

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21037

Sources EV-abcae829b8830c1a36ec90c7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 be7df570828d2d3310a777f593a97b45c956a6f80ddcae2cd8fa1de351b9a0cf

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21042

Sources EV-0889babb1690003cf9d113ec
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0ae514c88a89d6004d8d0a17d7539a9a48760cf09e685122be7da24c1331c010

Usage terms US government public domain

Source snapshots by date · USA · eia860

Equinix Great Oaks Blvd. Fuel Cell / EQ14A

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID62150
Utility Name2016 ESA Project Company, LLC
Plant Code62702
Plant NameEquinix Great Oaks Blvd. Fuel Cell
StateCA
CountySanta Clara
Generator IDEQ14A
TechnologyOther Natural Gas
Prime MoverFC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2.4
Nameplate Power Factor0.99
Summer Capacity (MW)2.4
Winter Capacity (MW)2.4
Minimum Load (MW)2.4
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year2017
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:21037

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21037

Sources EV-abcae829b8830c1a36ec90c7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 be7df570828d2d3310a777f593a97b45c956a6f80ddcae2cd8fa1de351b9a0cf

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Equinix Great Oaks Blvd. Fuel Cell / EQ14A

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID62150
Entity Name2016 ESA Project Company, LLC
Plant ID62702
Plant NameEquinix Great Oaks Blvd. Fuel Cell
Google MapMap
Bing MapMap
Plant StateCA
CountySanta Clara
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDEQ14A
Nameplate Capacity (MW)2.4
Net Summer Capacity (MW)2.4
Net Winter Capacity (MW)2.4
TechnologyOther Natural Gas
Energy Source CodeNG
Prime Mover CodeFC
Operating Month12
Operating Year2017
Status(OP) Operating
Latitude37.24097
Longitude-121.7826
Original text(OP) Operating
source_record_idOperating:21042

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21042

Sources EV-0889babb1690003cf9d113ec
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0ae514c88a89d6004d8d0a17d7539a9a48760cf09e685122be7da24c1331c010

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel