Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Arkabutla Lake Hydroelectric Project / NA2
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
2.5 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-ae8bcfbb99746e566116ca27
Net Summer Capacity (MW)
1.5 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-ae8bcfbb99746e566116ca27
Net Winter Capacity (MW)
1.4 MW
Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-ae8bcfbb99746e566116ca27
Detailed source fields
Original source field
Published value or condition
Entity ID
61906
Entity Name
Rye Development
Plant ID
62402
Plant Name
Arkabutla Lake Hydroelectric Project
Google Map
Map
Bing Map
Map
Plant State
MS
County
DeSoto
Balancing Authority Code
TVA
Sector
IPP Non-CHP
Generator ID
NA2
Nameplate Capacity (MW)
2.5
Net Summer Capacity (MW)
1.5
Net Winter Capacity (MW)
1.4
Technology
Conventional Hydroelectric
Energy Source Code
WAT
Prime Mover Code
HY
Planned Operation Month
7
Planned Operation Year
2028
Status
(P) Planned for installation, but regulatory approvals not initiated
Latitude
34.757926
Longitude
-90.12569
Original text
(P) Planned for installation, but regulatory approvals not initiated