Power assets and projects · USA · eia860m

Arkabutla Lake Hydroelectric Project / NA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-ae8bcfbb99746e566116ca27
Net Summer Capacity (MW)1.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-ae8bcfbb99746e566116ca27
Net Winter Capacity (MW)1.4 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-ae8bcfbb99746e566116ca27
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62402
Plant NameArkabutla Lake Hydroelectric Project
Google MapMap
Bing MapMap
Plant StateMS
CountyDeSoto
Balancing Authority CodeTVA
SectorIPP Non-CHP
Generator IDNA2
Nameplate Capacity (MW)2.5
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month7
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude34.757926
Longitude-90.12569
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1586

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:320

Sources EV-583b3a9f8e5db000d11f99f9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6676c083481e8763ba51e4bc0aba2fe3e108706f14de2e532a479766b541d4a0

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1586

Sources EV-ae8bcfbb99746e566116ca27
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e10dfcf88c866279958c7330ec8418eec020e1a91cf4bf0352b76a5c5c06635d

Usage terms US government public domain

Source snapshots by date · USA · eia860

Arkabutla Lake Hydroelectric Project / NA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61906
Utility NameRye Development
Plant Code62402
Plant NameArkabutla Lake Hydroelectric Project
StateMS
CountyDeSoto
Generator IDNA2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2.5
Nameplate Power Factor0.9
Summer Capacity (MW)1.5
Winter Capacity (MW)1.4
StatusP
Effective Month11
Effective Year2022
Current Month7
Current Year2028
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1WAT
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:320

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:320

Sources EV-583b3a9f8e5db000d11f99f9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6676c083481e8763ba51e4bc0aba2fe3e108706f14de2e532a479766b541d4a0

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Arkabutla Lake Hydroelectric Project / NA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62402
Plant NameArkabutla Lake Hydroelectric Project
Google MapMap
Bing MapMap
Plant StateMS
CountyDeSoto
Balancing Authority CodeTVA
SectorIPP Non-CHP
Generator IDNA2
Nameplate Capacity (MW)2.5
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month7
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude34.757926
Longitude-90.12569
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1586

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1586

Sources EV-ae8bcfbb99746e566116ca27
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e10dfcf88c866279958c7330ec8418eec020e1a91cf4bf0352b76a5c5c06635d

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel