POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Arkabutla Lake Hydroelectric Project / NA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-193b9e69a8094679decea5ba
Net Summer Capacity (MW)1.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-193b9e69a8094679decea5ba
Net Winter Capacity (MW)1.4 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-193b9e69a8094679decea5ba
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62402
Plant NameArkabutla Lake Hydroelectric Project
Google MapMap
Bing MapMap
Plant StateMS
CountyDeSoto
Balancing Authority CodeTVA
SectorIPP Non-CHP
Generator IDNA1
Nameplate Capacity (MW)2.5
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month6
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude34.757926
Longitude-90.12569
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1538

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:319

Sources EV-f49370e52e06d2d99f3b25a7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1ce3496269a30b26603f22f92e7058d350b7260d92d4355ab60f73545b306baf

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1538

Sources EV-193b9e69a8094679decea5ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7999dd3eb78018ca2fdf07c7e5a488cb800818c7da6aeb49bbbac7d3eb399cff

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Arkabutla Lake Hydroelectric Project / NA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62402
Plant NameArkabutla Lake Hydroelectric Project
Google MapMap
Bing MapMap
Plant StateMS
CountyDeSoto
Balancing Authority CodeTVA
SectorIPP Non-CHP
Generator IDNA1
Nameplate Capacity (MW)2.5
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month6
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude34.757926
Longitude-90.12569
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1538

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1538

Sources EV-193b9e69a8094679decea5ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7999dd3eb78018ca2fdf07c7e5a488cb800818c7da6aeb49bbbac7d3eb399cff

Usage terms US government public domain

Source snapshots by date · USA · eia860

Arkabutla Lake Hydroelectric Project / NA1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61906
Utility NameRye Development
Plant Code62402
Plant NameArkabutla Lake Hydroelectric Project
StateMS
CountyDeSoto
Generator IDNA1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2.5
Nameplate Power Factor0.9
Summer Capacity (MW)1.5
Winter Capacity (MW)1.4
StatusP
Effective Month10
Effective Year2022
Current Month6
Current Year2028
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1WAT
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:319

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:319

Sources EV-f49370e52e06d2d99f3b25a7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1ce3496269a30b26603f22f92e7058d350b7260d92d4355ab60f73545b306baf

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel