POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Allegheny L&D2 Hydroelectric Project / NA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)4.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-7eb5bded3ce997086415df8f
Net Summer Capacity (MW)2.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-7eb5bded3ce997086415df8f
Net Winter Capacity (MW)3.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-7eb5bded3ce997086415df8f
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62401
Plant NameAllegheny L&D2 Hydroelectric Project
Google MapMap
Bing MapMap
Plant StatePA
CountyAllegheny
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDNA2
Nameplate Capacity (MW)4.5
Net Summer Capacity (MW)2.5
Net Winter Capacity (MW)3.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month12
Planned Operation Year2030
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude40.89444
Longitude-79.91361
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:2103

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:318

Sources EV-030cce772c949e9c5c838f8b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9a4b4ee36475e4065ecbc939123e6e1ce86d804379db9b87389e88f44ac9da74

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2103

Sources EV-7eb5bded3ce997086415df8f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0f5cacce17cb20385b1a7e3a2665e8bfa04d74e9fc39ca59e19ea93bd1663037

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Allegheny L&D2 Hydroelectric Project / NA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62401
Plant NameAllegheny L&D2 Hydroelectric Project
Google MapMap
Bing MapMap
Plant StatePA
CountyAllegheny
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDNA2
Nameplate Capacity (MW)4.5
Net Summer Capacity (MW)2.5
Net Winter Capacity (MW)3.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month12
Planned Operation Year2030
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude40.89444
Longitude-79.91361
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:2103

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2103

Sources EV-7eb5bded3ce997086415df8f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0f5cacce17cb20385b1a7e3a2665e8bfa04d74e9fc39ca59e19ea93bd1663037

Usage terms US government public domain

Source snapshots by date · USA · eia860

Allegheny L&D2 Hydroelectric Project / NA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61906
Utility NameRye Development
Plant Code62401
Plant NameAllegheny L&D2 Hydroelectric Project
StatePA
CountyAllegheny
Generator IDNA2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)4.5
Nameplate Power Factor0.9
Summer Capacity (MW)2.5
Winter Capacity (MW)3.5
StatusP
Effective Month11
Effective Year2022
Current Month12
Current Year2030
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1WAT
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:318

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:318

Sources EV-030cce772c949e9c5c838f8b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9a4b4ee36475e4065ecbc939123e6e1ce86d804379db9b87389e88f44ac9da74

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel