Montgomery L&D Hydroelectric Project / NA3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)6.8 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-7de0915c1108495b3cd2cf0a
Net Summer Capacity (MW)5.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-7de0915c1108495b3cd2cf0a
Net Winter Capacity (MW)6.3 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-7de0915c1108495b3cd2cf0a
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62400
Plant NameMontgomery L&D Hydroelectric Project
Google MapMap
Bing MapMap
Plant StatePA
CountyBeaver
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDNA3
Nameplate Capacity (MW)6.8
Net Summer Capacity (MW)5.5
Net Winter Capacity (MW)6.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude40.652478
Longitude-80.38687
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1741

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:316

Sources EV-c16122a0baa08c9f35c0989c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46215267b4edbeaefc3c381c48372d06b355007d10250cc2dca9fabf55fde53e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1741

Sources EV-7de0915c1108495b3cd2cf0a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2f754a385bc918fa1745a22737174a3d57bdbfa1afa403c3246fae37c92f6989

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Montgomery L&D Hydroelectric Project / NA3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62400
Plant NameMontgomery L&D Hydroelectric Project
Google MapMap
Bing MapMap
Plant StatePA
CountyBeaver
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDNA3
Nameplate Capacity (MW)6.8
Net Summer Capacity (MW)5.5
Net Winter Capacity (MW)6.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude40.652478
Longitude-80.38687
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1741

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1741

Sources EV-7de0915c1108495b3cd2cf0a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2f754a385bc918fa1745a22737174a3d57bdbfa1afa403c3246fae37c92f6989

Usage terms US government public domain

Source snapshots by date · USA · eia860

Montgomery L&D Hydroelectric Project / NA3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61906
Utility NameRye Development
Plant Code62400
Plant NameMontgomery L&D Hydroelectric Project
StatePA
CountyBeaver
Generator IDNA3
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)6.8
Nameplate Power Factor0.9
Summer Capacity (MW)5.5
Winter Capacity (MW)6.3
StatusP
Effective Month11
Effective Year2022
Current Month12
Current Year2028
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1WAT
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:316

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:316

Sources EV-c16122a0baa08c9f35c0989c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46215267b4edbeaefc3c381c48372d06b355007d10250cc2dca9fabf55fde53e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel