POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Overton Hydroelectric Project / NA5

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)8.1 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-9dff2467141a1014a7584d54
Net Summer Capacity (MW)5.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-9dff2467141a1014a7584d54
Net Winter Capacity (MW)7.5 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-9dff2467141a1014a7584d54
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62391
Plant NameOverton Hydroelectric Project
Google MapMap
Bing MapMap
Plant StateLA
CountyRapides
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDNA5
Nameplate Capacity (MW)8.1
Net Summer Capacity (MW)5.5
Net Winter Capacity (MW)7.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month8
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude31.185978
Longitude-92.29309
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1628

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:312

Sources EV-e4eaa25a9ce9c8a86c9f79c7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9afdc3ed78132d000754090d02ed02462ce99e048d9209b11a9d4b43d72225f6

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1628

Sources EV-9dff2467141a1014a7584d54
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c539debd852f712cda3914764a596a259e3b8ec8a0a00a5340e5c590fc221f61

Usage terms US government public domain

Source snapshots by date · USA · eia860

Overton Hydroelectric Project / NA5

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61906
Utility NameRye Development
Plant Code62391
Plant NameOverton Hydroelectric Project
StateLA
CountyRapides
Generator IDNA5
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)8.1
Nameplate Power Factor0.9
Summer Capacity (MW)5.5
Winter Capacity (MW)7.5
StatusP
Effective Month11
Effective Year2022
Current Month8
Current Year2028
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1WAT
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:312

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:312

Sources EV-e4eaa25a9ce9c8a86c9f79c7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9afdc3ed78132d000754090d02ed02462ce99e048d9209b11a9d4b43d72225f6

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Overton Hydroelectric Project / NA5

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID61906
Entity NameRye Development
Plant ID62391
Plant NameOverton Hydroelectric Project
Google MapMap
Bing MapMap
Plant StateLA
CountyRapides
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDNA5
Nameplate Capacity (MW)8.1
Net Summer Capacity (MW)5.5
Net Winter Capacity (MW)7.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Planned Operation Month8
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude31.185978
Longitude-92.29309
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1628

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1628

Sources EV-9dff2467141a1014a7584d54
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c539debd852f712cda3914764a596a259e3b8ec8a0a00a5340e5c590fc221f61

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel