POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Mesteno / MES

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)201.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-cb1898b991482b392bbc30e5
Net Summer Capacity (MW)200 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-cb1898b991482b392bbc30e5
Net Winter Capacity (MW)200 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-cb1898b991482b392bbc30e5
Detailed source fields
Original source fieldPublished value or condition
Entity ID65411
Entity NameDeriva Energy
Plant ID62258
Plant NameMesteno
Google MapMap
Bing MapMap
Plant StateTX
CountyStarr
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDMES
Nameplate Capacity (MW)201.6
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month12
Operating Year2019
Status(OP) Operating
Latitude26.523692
Longitude-98.74552
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:20541

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:20537

Sources EV-0d12007b5c90980ac3643749
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0c64758c52b6a389607765faa978cad4e94c4871d2556fab95b658eef0f9c252

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:20541

Sources EV-cb1898b991482b392bbc30e5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e0ff3bce0ad274d8c4f8254bbf82db487d6fff969780c04b76d46950bd6a3599

Usage terms US government public domain

Source snapshots by date · USA · eia860

Mesteno / MES

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID65411
Utility NameDeriva Energy
Plant Code62258
Plant NameMesteno
StateTX
CountyStarr
Generator IDMES
TechnologyOnshore Wind Turbine
Prime MoverWT
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)201.6
Summer Capacity (MW)200
Winter Capacity (MW)200
Minimum Load (MW)3
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year2019
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WND
Turbines or Hydrokinetic Buoys56
Other Combustion Technology?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:20537

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:20537

Sources EV-0d12007b5c90980ac3643749
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0c64758c52b6a389607765faa978cad4e94c4871d2556fab95b658eef0f9c252

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Mesteno / MES

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID65411
Entity NameDeriva Energy
Plant ID62258
Plant NameMesteno
Google MapMap
Bing MapMap
Plant StateTX
CountyStarr
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDMES
Nameplate Capacity (MW)201.6
Net Summer Capacity (MW)200
Net Winter Capacity (MW)200
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month12
Operating Year2019
Status(OP) Operating
Latitude26.523692
Longitude-98.74552
Original text(OP) Operating
source_record_idOperating:20541

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:20541

Sources EV-cb1898b991482b392bbc30e5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e0ff3bce0ad274d8c4f8254bbf82db487d6fff969780c04b76d46950bd6a3599

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel