Blue Water Energy Center / 11

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)394.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d11790c17cac3c9aca40dad2
Net Summer Capacity (MW)359 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d11790c17cac3c9aca40dad2
Net Winter Capacity (MW)375.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d11790c17cac3c9aca40dad2
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID62192
Plant NameBlue Water Energy Center
Google MapMap
Bing MapMap
Plant StateMI
CountySt Clair
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID11
Unit CodeBWEC
Nameplate Capacity (MW)394.4
Net Summer Capacity (MW)359
Net Winter Capacity (MW)375.6
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month6
Operating Year2022
Status(OP) Operating
Latitude42.773716
Longitude-82.47933
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:20469

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:20465

Sources EV-1be16a630d73edf8983e1881
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 438109f43eb6514f4338b75f93ba0a4ec7163c0b5ee5271b82e9a66252d73adf

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:20469

Sources EV-d11790c17cac3c9aca40dad2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2f01025243fb53b5fe8626fdbbcd6ef1c6fc869a1d28c7ed9c91206d8be9b134

Usage terms US government public domain

Source snapshots by date · USA · eia860

Blue Water Energy Center / 11

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code62192
Plant NameBlue Water Energy Center
StateMI
CountySt Clair
Generator ID11
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCT
Unit CodeBWEC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?N
Nameplate Capacity (MW)394.4
Nameplate Power Factor0.85
Summer Capacity (MW)359
Winter Capacity (MW)375.6
Minimum Load (MW)150
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year2022
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:20465

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:20465

Sources EV-1be16a630d73edf8983e1881
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 438109f43eb6514f4338b75f93ba0a4ec7163c0b5ee5271b82e9a66252d73adf

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Blue Water Energy Center / 11

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID62192
Plant NameBlue Water Energy Center
Google MapMap
Bing MapMap
Plant StateMI
CountySt Clair
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID11
Unit CodeBWEC
Nameplate Capacity (MW)394.4
Net Summer Capacity (MW)359
Net Winter Capacity (MW)375.6
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month6
Operating Year2022
Status(OP) Operating
Latitude42.773716
Longitude-82.47933
Original text(OP) Operating
source_record_idOperating:20469

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:20469

Sources EV-d11790c17cac3c9aca40dad2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2f01025243fb53b5fe8626fdbbcd6ef1c6fc869a1d28c7ed9c91206d8be9b134

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel