Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Camas Solar Project / CAMAS

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-07c86f3c11a6d8b3173ddb42
Net Summer Capacity (MW)5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-07c86f3c11a6d8b3173ddb42
Net Winter Capacity (MW)5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-07c86f3c11a6d8b3173ddb42
DC Net Capacity (MW)6.7 MWdcOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-07c86f3c11a6d8b3173ddb42
Detailed source fields
Original source fieldPublished value or condition
Entity ID60281
Entity NameAltus Power America Management, LLC
Plant ID62071
Plant NameCamas Solar Project
Google MapMap
Bing MapMap
Plant StateWA
CountyKittitas
Balancing Authority CodePSEI
SectorIPP Non-CHP
Generator IDCAMAS
Nameplate Capacity (MW)5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month6
Operating Year2022
Status(OP) Operating
DC Net Capacity (MW)6.7
Latitude46.95931
Longitude-120.5091
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:20350

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:20346

Sources EV-7001432466292bb90ea681f0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 08608d337ea011a8334815735e695850584ca0bbea89ac3386a105db5fc4dcd4

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:20350

Sources EV-07c86f3c11a6d8b3173ddb42
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 66caa4521459e755ad7233ba3c54f20b13f8bef3201051cd826de91f27699d30

Usage terms US government public domain

Source snapshots by date · USA · eia860

Camas Solar Project / CAMAS

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID60281
Utility NameAltus Power America Management, LLC
Plant Code62071
Plant NameCamas Solar Project
StateWA
CountyKittitas
Generator IDCAMAS
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)5
Summer Capacity (MW)5
Winter Capacity (MW)5
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year2022
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1SUN
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:20346

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:20346

Sources EV-7001432466292bb90ea681f0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 08608d337ea011a8334815735e695850584ca0bbea89ac3386a105db5fc4dcd4

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Camas Solar Project / CAMAS

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID60281
Entity NameAltus Power America Management, LLC
Plant ID62071
Plant NameCamas Solar Project
Google MapMap
Bing MapMap
Plant StateWA
CountyKittitas
Balancing Authority CodePSEI
SectorIPP Non-CHP
Generator IDCAMAS
Nameplate Capacity (MW)5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Operating Month6
Operating Year2022
Status(OP) Operating
DC Net Capacity (MW)6.7
Latitude46.95931
Longitude-120.5091
Original text(OP) Operating
source_record_idOperating:20350

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:20350

Sources EV-07c86f3c11a6d8b3173ddb42
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 66caa4521459e755ad7233ba3c54f20b13f8bef3201051cd826de91f27699d30

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel