POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Brame Energy Center / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)703.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-536afae46892e920c0bda675
Net Summer Capacity (MW)634.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-536afae46892e920c0bda675
Net Winter Capacity (MW)628 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-536afae46892e920c0bda675
Detailed source fields
Original source fieldPublished value or condition
Entity ID3265
Entity NameCleco Power LLC
Plant ID6190
Plant NameBrame Energy Center
Google MapMap
Bing MapMap
Plant StateLA
CountyRapides
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)703.8
Net Summer Capacity (MW)634.2
Net Winter Capacity (MW)628
TechnologyPetroleum Coke
Energy Source CodePC
Prime Mover CodeST
Operating Month2
Operating Year2010
Status(OP) Operating
Latitude31.395
Longitude-92.71667
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6236

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6230

Sources EV-c9efa93f7160e2b050c2a404
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ac670e3e2881b3fdb041c94e642a3e10ff7bae0efde159fdedc0d62fb0447bf6

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6236

Sources EV-536afae46892e920c0bda675
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0ec49185030e84ac381e3a8ec40525232da00b0c82d593766d912d7174ecd9a6

Usage terms US government public domain

Source snapshots by date · USA · eia860

Brame Energy Center / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3265
Utility NameCleco Power LLC
Plant Code6190
Plant NameBrame Energy Center
StateLA
CountyRapides
Generator ID3
TechnologyPetroleum Coke
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationCLECO.MPS3
Nameplate Capacity (MW)703.8
Nameplate Power Factor0.85
Summer Capacity (MW)634.2
Winter Capacity (MW)628
Minimum Load (MW)400
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month2
Operating Year2010
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1PC
Energy Source 2BIT
Energy Source 3NG
Energy Source 4SUB
Energy Source 5LIG
Startup Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full LoadOVER
Fluidized Bed Technology?Y
Subcritical Technology?Y
Multiple Fuels?Y
Cofire Fuels?Y
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:6230

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6230

Sources EV-c9efa93f7160e2b050c2a404
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ac670e3e2881b3fdb041c94e642a3e10ff7bae0efde159fdedc0d62fb0447bf6

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Brame Energy Center / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID3265
Entity NameCleco Power LLC
Plant ID6190
Plant NameBrame Energy Center
Google MapMap
Bing MapMap
Plant StateLA
CountyRapides
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)703.8
Net Summer Capacity (MW)634.2
Net Winter Capacity (MW)628
TechnologyPetroleum Coke
Energy Source CodePC
Prime Mover CodeST
Operating Month2
Operating Year2010
Status(OP) Operating
Latitude31.395
Longitude-92.71667
Original text(OP) Operating
source_record_idOperating:6236

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6236

Sources EV-536afae46892e920c0bda675
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0ec49185030e84ac381e3a8ec40525232da00b0c82d593766d912d7174ecd9a6

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel